Gangue filling and grouting construction method suitable for horizontal working face of short wall roadway
A technology of short-wall road mining and construction method, which is applied in the fields of backfill, mining equipment, earth-moving drilling and mining, etc., can solve the problems of large demand for fly ash, poor grouting effect, and large interference, so as to avoid secondary damage. , reduce the impact, good grouting effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The present invention is described in detail below in conjunction with accompanying drawing and specific embodiment:
[0030] The present invention designs a gangue filling and grouting construction method suitable for the horizontal working face of short-wall roadway mining, which is realized through the following steps:
[0031] 1) Headway excavation: such as figure 1 As shown, several level roadways A are excavated in the horizontal working face, respectively labeled 1, 2...n-1, n, and the gangue and slurry wall D are set up on the side of the transportation road B near the working face. Thickness to withstand grouting pressure p , the width of the level lane A is b , the width of coal pillar E between two level roadways A is a , a and b Satisfy the following formula:
[0032] , where: M is the coal seam thickness, H is the mining depth.
[0033] 2) Layout of grouting pipe: such as Figure 2-3 As shown, a number of alley grouting pipes 1 are arranged on ...