The invention discloses a multi-
robot abnormal position complementing scheduling method in an industrial scene, and relates to the technical field of
industrial robot scheduling, and the scheduling method comprises the following steps: S1, configuring a multi-source sensing unit for each
industrial robot, and constructing a multi-dimensional abnormal sensing model to achieve the real-time monitoring and precise recognition of the abnormal state of the
robot; s2, designing a layered position covering scheduling framework to generate an initial position covering scheme; s3, an improved self-adaptive scheduling
algorithm is adopted to optimize a position complementing scheme; s4, establishing a dynamic adjustment mechanism to realize real-time optimization of the position covering process; s5, state feedback and
knowledge base updating are carried out after position complementing is completed; multi-dimensional data such as the running state, the environment and the task progress of the
robot are collected through the multi-source sensing unit,
feature fusion is achieved through a weighted fusion
algorithm, accurate judgment is conducted in combination with an anomaly recognition
knowledge base, the anomaly misjudgment rate and the anomaly missed judgment rate are effectively reduced, the anomaly recognition accuracy is effectively improved, and a reliable basis is provided for follow-up position covering scheduling.