Device for preventing slurry leakage at root of concrete aluminum formwork and using method thereof
An aluminum formwork and concrete technology, which is used in the connection of formwork/formwork/work frame, the preparation of building components on site, construction, etc., can solve the problem of poor adhesion between cement mortar and aluminum formwork, and the strength cannot reach concrete. Pouring requirements, inconvenient ways to support concrete aluminum formwork, etc., to save labor and materials, reduce construction costs, and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] The device for preventing grout leakage at the root of the concrete aluminum formwork of the present invention is a quick-detachable aluminum formwork used for concrete pouring of a shear wall, including angle aluminum, a first angle iron, and a second angle iron.
[0040] see now figure 1 with figure 2 , figure 1 It is a schematic diagram of the use state of the device for preventing grout leakage at the root of the concrete aluminum formwork according to the embodiment of the present invention, figure 2 for figure 1 Sectional view of A-A in Fig. As shown in the figure, the angle aluminum 2 is an equilateral aluminum alloy angle aluminum with a specification of ∠65*65*4, and a number of bolt holes are arranged on one side of the angle aluminum.
[0041] The first angle iron 3 is an equilateral angle iron of specification ∠50*50*3, and a number of bolt holes are arranged on one side of the first angle iron, and the first angle iron is arranged on the right angle i...
Embodiment 2
[0044] A method for using a device for preventing grout leakage at the root of concrete aluminum formwork, comprising the following steps:
[0045] a. Set the 90-degree right-angled side of the aluminum formwork 1
[0046] The aluminum formwork 1 close to the root of the wall of the quick-release aluminum formwork poured with concrete for the shear wall is bent to the outside of the wall to form a 90-degree right-angle side, and a number of bolt holes are arranged on the plane of the right-angle side.
[0047] b. Install the angle aluminum
[0048] The installed angle aluminum 2 is an equilateral aluminum alloy angle aluminum with a specification of ∠65*65*4, and a number of bolt holes are arranged on one side of the angle aluminum, so that the angle aluminum bolt holes match and align with the aluminum formwork bolt holes.
[0049] c. Install the first angle iron
[0050] The first angle iron 3 is an equilateral angle iron of specification ∠50*50*3, and a number of bolt hol...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


