A method of manufacturing a wind power blade root prefabricated part
A wind power blade and a manufacturing method technology are applied in the field of manufacture of wind power blade root prefabricated parts, which can solve the problems of not considering exothermic peak temperature difference, difficulty in bolt installation, blade root prefabricated parts or blade scrapping, etc., so as to shorten the curing time , the effect of reducing internal stress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] 1) Pass water at 30°C into the blade root prefabricated mold, complete the laying and installation of the blade root prefabricated parts on the blade root prefabricated mould, vacuum infuse the resin, and the resin starts to solidify;
[0045] 2) 2 hours after the vacuum infusion of resin is completed, lay a quilt on the upper surface of the blade root prefabricated part, raise the temperature of the water passed into the blade root prefabricated mold to 40°C, and heat up the blade root prefabricated mold. After 4 hours, the resin Curing is complete; control the exothermic peak temperature during the entire resin curing process to 55°C;
[0046] 3) Cool down the water passed into the mold of the blade root preform at a cooling rate of 3°C / h, so that the temperature difference between the temperature of the blade root preform mold and the temperature of the inner surface of the blade root preform is below 10°C, when the blade root preform When the positive temperature di...
Embodiment 2
[0048] 1) Pass water at 33°C into the blade root prefabricated mold, complete the laying and installation of the blade root prefabricated parts on the blade root prefabricated mould, vacuum infuse the resin, and the resin begins to solidify;
[0049] 2) 3 hours after the vacuum infusion of resin is completed, lay insulation cotton on the upper surface of the blade root prefabricated part, raise the temperature of the water passed into the blade root prefabricated mold to 50°C, and heat up the blade root prefabricated mold. After 5 hours, the resin Curing is complete; the exothermic peak temperature during the entire resin curing process is 60°C;
[0050] 3) Cool down the water passed into the mold of the blade root preform, the cooling rate is 8°C / h, so that the temperature difference between the temperature of the blade root preform mold and the temperature of the inner surface of the blade root preform is below 10°C, when the blade root preform When the positive temperature ...
Embodiment 3
[0052] 1) Pass water at 35°C into the blade root prefabricated mold, complete the laying and installation of the blade root prefabricated parts on the blade root prefabricated mould, vacuum infuse the resin, and the resin begins to solidify;
[0053] 2) 4 hours after the vacuum infusion of resin is completed, lay a sponge on the upper surface of the blade root prefabricated part, raise the temperature of the water passed into the blade root prefabricated mold to 60°C, heat up the blade root prefabricated mold, and the resin will solidify after 6 hours Complete; control the exothermic peak temperature during the entire resin curing process to be 70°C;
[0054] 3) Cool down the water passed into the mold of the blade root preform at a cooling rate of 12°C / h, so that the temperature difference between the temperature of the blade root preform mold and the temperature of the inner surface of the blade root preform is below 10°C, when the blade root preform When the positive temper...