Urban undercrossing tunnel prefabricating construction method and prefabricating assembling and tunneling machine
A technology of prefabricated assembly and construction methods, applied in artificial islands, water conservancy projects, underwater structures, etc., can solve problems such as difficult angles of the guide plate transmission structure, difficulty in controlling the guide plate device, and affecting on-site assembly construction, etc., to achieve reduction The effect of reducing the amount of manual work, reducing the amount of earthwork excavation and transportation, and meeting the requirements of low-carbon energy saving
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] Such as Figure 1~5 Among them, a prefabricated construction method for urban underpass tunnels, including the following steps:
[0046] s1. Divide the entire underpass tunnel into the first half and the second half, wherein the middle wall 31 of the frame section is located in the first half; this solution can reduce the occupation of the road surface and reduce traffic congestion. In a further preferred scheme, the construction path is to construct from one end of the first half to the other end, and then the second half is also constructed from the end of the first half until the other end of the second half. From this scheme, Allow sufficient setting time for small quantities of cast-in-place components.
[0047] s2. After the construction of the first half shallow channel section 1 is completed, the deep channel section 2, the frame section 3 and the deep channel section 2 at the other end are sequentially constructed with the prefabricated and assembled roadheade...
Embodiment 2
[0066] On the basis of Example 1, such as Figure 6~12 Among them, a prefabricated and assembled roadheader for the prefabricated and assembled construction method of the above-mentioned urban underpass tunnel, the prefabricated and assembled roadheader 5 is divided into a first half-width roadheader 51 and a second half-width roadheader 52; Assembling the roadheader 5 reduces interference in the construction process.
[0067] The front portion of the prefabricated assembled roadheader 5 is a tunneling bin 53, and the rear portion is an assembled bin 54;
[0068] The structure of the first half-width roadheader 51 is as follows: the jacking box girder 10 is provided with a plurality of jacking cylinder devices 6, and the two sides of the jacking box girder 10 are provided with retaining plates 8, and the retaining plates 8 extend to the pushing box girder. Beyond the horizontal plane projection of 10;
[0069] The structure of the second half-width roadheader 52 is as follow...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com