Scouring resisting improvement revamping system used for river-and-lake boundary water-level fluctuation zone and laying method
An ebb and flow zone and anti-scour technology, applied in the fields of botanical equipment and methods, horticulture, container cultivation, etc., can solve the problem that the diversity of plant growth in the ebb and flow zone is not considered, and it cannot adapt to the large-scale changes in the amphibious growth environment for a long time. , low plant survival rate, etc., to achieve the effects of soil erosion control, strong resistance to water erosion, and high survival rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] An anti-scour reconstruction system for the ebb and flow zone at the boundary of rivers and lakes, the system includes a slope body, on which a 3D soil-fixing mesh pad is laid, and a flat-bottomed 3D soil-fixing mesh pad is laid above the constant water level of the slope body 1. Lay a filled 3D soil-fixing mesh pad 3 below the normal water level of the slope body, and set grooves 6 at the top and foot of the slope body. The depth and width of the grooves are both 400mm. The two ends of the soil mesh pads are put into the grooves respectively, and then the mesh pads and the soil layer are fixed with steel nails 4. The two adjacent 3D soil-fixing mesh pads are laid in a lap joint, and the width of the lap joint is 250mm, and the overlapping method is that the upstream 3D soil-fixing mesh pad along the water flow direction is pressed on the downstream 3D soil-fixing mesh pad, and the overlapping parts of two adjacent 3D soil-fixing mesh pads are fixed with steel nails 4, a...
Embodiment 2
[0025] A laying method for an anti-scour reconstruction system for a river-lake boundary ebb and flow zone, comprising the following steps: 1. Repairing the slope, and for the river-lake boundary ebb and flow zone that needs to be repaired, choose to clear the current slope during the low water level period Rocks with large particle size, plant roots and other garbage should be filled in the low-lying areas. After the slope is cut, 300mm of cultivated soil can be backfilled and compacted according to the actual soil quality, so as to facilitate the planting and growth of plants. The slope foundation covered by the soil-fixing mat must be stable; 2. Groove: at the top and foot of the slope on the river bank, respectively open a groove with a depth and width of not less than 300mm; 3. After finishing the slope surface, you can pre-bury the vegetation rhizomes or sow the vegetation seeds suitable for local growth. The recommended seed density is not less than 30g / m 2, and then la...
PUM
Property | Measurement | Unit |
---|---|---|
Depth | aaaaa | aaaaa |
Width | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com