A Greening Method for High and Steep Rocky Slopes of Mine
A rocky slope, high and steep technology, applied in the field of slope ecological restoration, to prevent scour, reduce impact, and have favorable effects of slope stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Such as Figure 1-Figure 5 As shown, Embodiment 1 of the present invention provides a method for greening a steep rock slope of a mine, which includes the following steps:
[0029] Step S1: Place slope 1 at a stable slope angle. When slope 1 is relatively high, slope 1 adopts multi-stage grading;
[0030] Step S2: excavate the top intercepting ditch 2 along the top of the slope 1, excavate the bottom drainage ditch 3 along the toe of the slope 1, and on the slope surface between the top intercepting ditch 2 and the bottom drainage ditch 3 Several rows of slope planting troughs 4 were excavated on the top, and the slope planting troughs 4 were arranged in parallel at a distance of 5m-10m. The upper and lower ends of the slope planting trough 4 were connected to the slope top intercepting ditch 2 and the slope toe drainage ditch respectively 3. Slots 41 are opened in the slope planting groove 4 at a certain interval (can also be left, the groove (ridge) is not less than 50mm ...
Embodiment 2
[0037] Such as Figure 1-Figure 5 As shown, embodiment 2 of the present invention provides a method for greening a high-steep rock slope 1 in a mine. The steps of the method are basically the same as those of embodiment 1, except that step A1 is included between step S3 and step S4. : Lay geotextile 9 in the soil tank. By laying the geotextile 9 in the soil tank, it is possible to prevent the planting soil 7 in the soil tank from being lost from the gap between the prefabricated partition 6 and the slope planting tank 4.
Embodiment 3
[0039] Such as Figure 1-Figure 5 As shown, embodiment 3 of the present invention provides a method for greening a high-steep rock slope in a mine. The steps of the method are basically the same as those of embodiment 1, except that step S2 and step S3 further include step B1: A plastic drainage board 10 is laid along the slope planting groove 4, and the plastic drainage board 10 is attached to the bottom of the planting groove 4 on the slope. The plastic drainage board 10 has the function of guiding seepage water. By laying the plastic drainage board 10 on the bottom of the slope planting trough 4, the seepage effect of irrigation water can be improved, even the planting soil 7 near the slope toe can be better. Compared with the traditional irrigation methods of seepage pipe and drip irrigation pipe, the cost of the plastic drainage board 10 is lower and the construction is more convenient.