Unlock instant, AI-driven research and patent intelligence for your innovation.

Automatic shield tunnel earth surface sedimentation monitoring and pre-warning system and method

An automatic monitoring and surface subsidence technology, applied in tunnels, earth-moving drilling, mining equipment, etc., can solve the problems of guiding construction, large thrust, collapse, etc., to achieve the effect of convenient layout, prevention of safety risks, and simple structure

Pending Publication Date: 2019-02-12
CHINA UNIV OF MINING & TECH (BEIJING) +1
View PDF6 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the surface settlement of shield tunneling has also become a problem that cannot be ignored. Although there are relevant monitoring methods for surface settlement at present, most of them have complex structures and cannot be monitored dynamically at any time. It is impossible to analyze, guide construction and adjust working conditions based on real-time monitoring data.
[0003] In view of the objective problems faced by the construction of large-diameter shield tunnels on the Beijing New Airport Line, such as long tunnel sections, complicated soil passages, and large tunnel diameters (8.8m), it is often necessary to adjust the shield machine during the advancement of the shield machine. In the process of working condition adjustment, unreasonable parameter adjustment is likely to occur, such as excessive thrust, low earth pressure and actual underpressure propulsion. Once the parameters are unreasonable, excessive surface subsidence or even subsidence may occur

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Automatic shield tunnel earth surface sedimentation monitoring and pre-warning system and method
  • Automatic shield tunnel earth surface sedimentation monitoring and pre-warning system and method
  • Automatic shield tunnel earth surface sedimentation monitoring and pre-warning system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention more clear, the embodiments of the present invention will be further described in detail below in conjunction with the embodiments and the accompanying drawings. Here, the exemplary embodiments and descriptions of the present invention are used to explain the present invention, but not to limit the present invention.

[0031] In describing the present invention, it is to be understood that the terms "comprises / comprising", "consisting of" or any other variation thereof are intended to cover a non-exclusive inclusion such that a product, device, A process or method includes not only those elements, but may also include other elements not expressly listed, or elements inherent in such a product, apparatus, process, or method, as required. Without further limitations, an element defined by the phrase "comprising / comprising...", "consisting of... does not exclude the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides anautomatic shield tunnel earth surface sedimentation monitoring and pre-warning system. The automatic shield tunnel earth surface sedimentation monitoring and pre-warning system comprises an automatic collecting system and a pre-warning system, the automatic collecting system senses shield earth surface sedimentation and generates corresponding electric signals, and the pre-warning system can receive electric signal data and automatically performs early warning under a preset condition. In the advancing process of a shield machine under a normal fluctuant working condition, sample time history curve initial values of a plurality of monitoring points at different distances from a cutter head are measured in advance, envelope curves of samples are adopted as an upperlimit and a lower limit of a standard time history curve,the upper limit and the lower limit of the standard time history curve are treated as sedimentation range values of a pre-warning procedure ofthe pre-warning system, when a working condition of the shield machine needs to be adjusted, the shield tunnel earth surface sedimentation automatic monitoring and pre-warning systems are distributedat the monitoring points at different positions on a tunnel axis earth surface in front of the cutter head corresponding to the standard time history curve, and when the pre-warning system receives amonitoring value exceeding the standard time history curve upper limit and the standard time history curve lower limit, the pre-warning system automatically performs early warning.

Description

technical field [0001] The invention relates to the field of shield tunnel surface settlement monitoring, in particular to an automatic monitoring and early warning system and early warning method for shield tunnel surface settlement. Background technique [0002] The construction technology of shield method is the key technology of subway construction project. With the continuous construction of rail transit, shield construction has occupied a place in urban rail transit construction because of its fast and safe construction. However, shield surface settlement has also become a problem that cannot be ignored. Although there are relevant monitoring methods for surface settlement at present, most of them have complex structures and cannot be monitored dynamically at any time. It is impossible to analyze, guide construction, and adjust working conditions based on real-time monitoring data. [0003] In view of the objective problems faced by the construction of large-diameter s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21F17/18E21D9/08
CPCE21D9/08E21F17/18
Inventor 江华李宏亮周刘刚武福美刘双全
Owner CHINA UNIV OF MINING & TECH (BEIJING)