Unlock instant, AI-driven research and patent intelligence for your innovation.

Prefabricated steel-reinforced concrete column splicing joint structure and construction method thereof

A concrete column and prefabricated assembly technology, applied in the direction of columns, pier columns, pillars, etc., can solve the problems of less splicing joint forms and cumbersome implementation methods, so as to improve construction efficiency and safety, solve weak connections, and good feasibility Effect

Pending Publication Date: 2019-02-15
HUAQIAO UNIVERSITY
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the splicing joints of the existing prefabricated steel concrete columns are less, and the specific implementation methods are relatively cumbersome

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated steel-reinforced concrete column splicing joint structure and construction method thereof
  • Prefabricated steel-reinforced concrete column splicing joint structure and construction method thereof
  • Prefabricated steel-reinforced concrete column splicing joint structure and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The technical solutions of the present invention will be further illustrated and described below through specific embodiments.

[0033] Such as figure 1 and figure 2 As shown, a prefabricated assembled steel concrete column splicing joint structure includes an upper steel concrete column 1 and a lower steel concrete column 2 with square cross sections, the lower end of the upper steel concrete column 1 and the upper end of the lower steel concrete column 2 The area in between is connection area 3.

[0034] The upper steel concrete column 1 includes an upper cross-shaped steel 10 in the middle and reinforced concrete surrounding the upper cross-shaped steel 10. The lower end of the upper cross-shaped steel 10 protrudes from the lower end of the upper steel concrete column 1, and the upper cross-shaped The lower end of the concrete column 1 has several upper outwardly extending longitudinal bars 11 arranged on the outer periphery of the lower end of the upper cross-sha...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Thicknessaaaaaaaaaa
Diameteraaaaaaaaaa
Login to View More

Abstract

The invention discloses a prefabricated steel-reinforced concrete column splicing joint structure and a construction method thereof. The prefabricated steel-reinforced concrete column splicing joint structure comprises an upper steel-reinforced concrete column and a lower steel-reinforced concrete column, and an area between the lower end of the upper steel-reinforced concrete column and the upperend of the lower steel-reinforced concrete column is a connecting area. Ultra-high performance concrete is poured in the connecting area to enable the upper steel-reinforced concrete column and the lower steel-reinforced concrete column to be connected as a whole. The prefabricated steel-reinforced concrete column splicing joint structure applies the ultra-high performance concrete between the prefabricated steel-concrete columns, and fully utilizes the excellent compression resistance and tensile performance of the ultra-high performance concrete, thereby solving the problem of weak connection in joint regions.

Description

technical field [0001] The invention belongs to the technical field of building structures, and in particular relates to a prefabricated assembled steel concrete column splicing node structure and a construction method thereof. Background technique [0002] The prefabricated steel concrete structure is one of the important directions for the development of building structures in my country. The prefabricated steel concrete column has the advantages of controllable product quality, green environmental protection and convenient construction. The column-column connection method is an important connection method in the prefabricated structural system. It directly affects the construction speed and the degree of assembly of the structure. Therefore, the construction method of the column-column splicing joint should be as simple as possible, and its strength should not be lower than that of prefabricated steel concrete. column strength. However, the existing prefabricated steel c...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B1/30E04C3/32E04C3/34E04B1/58
CPCE04B1/30E04C3/32E04C3/34
Inventor 胡红松方膨膨郭子雄王晨
Owner HUAQIAO UNIVERSITY