Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

23results about How to "Increase working space" patented technology

Humanoid double-arm explosive ordnance disposal robot

The invention discloses a humanoid double-arm explosive ordnance disposal robot, which relates to the technical field of intelligent robots and is provided with two humanoid mechanical arms, and each mechanical arm has seven degrees of freedom. By arranging the pitching joint, the folding size of the robot can be reduced, and the integrity of the robot is good. A trunk rotating joint is arranged, and the working space of the robot can be enlarged. The multi-section crawler chassis is arranged, four swing arms are arranged, and the robot can pass through various complex terrains. A tool quick-change disc is arranged at the tail end of the mechanical arm, and automatic quick change of the explosive-handling tool can be achieved. The explosive ordnance disposal device can meet various explosive ordnance disposal operation scenes, and can be placed on a high platform, a vehicle bottom, a subway station seat bottom and other low places for explosive ordnance disposal operation.
Owner:CHINA ORDNANCE EQUIP GRP AUTOMATION RES INST CO LTD

Upper loading structure of multifunctional treatment robot

PendingCN119017409AIncrease working spacequick changeArmsRobot handControl engineering
The invention discloses a loading structure of a multifunctional disposal robot, and relates to the technical field of explosive ordnance disposal robots, a single anthropomorphic double-mechanical-arm structure is arranged on a carrying platform, two mechanical arms simulate a left arm and a right arm of a person and can work cooperatively, each mechanical arm has seven degrees of freedom, the operation space of a mechanical arm is greatly enlarged, and the working efficiency is improved. And each mechanical arm can independently complete operation. A quick-change actuator is arranged at the tail end of the mechanical arm, and tool modules including the mechanical arm can be quickly replaced and installed; modules such as a look-around camera assembly, an ultrasonic sensor and a pan-tilt camera are arranged at all positions of the upper part and used for achieving the functions of autonomous obstacle avoidance, remote monitoring, control and the like of the explosive-handling robot. Modularization design is adopted in the whole device, the structure is compact, the weight is relatively light, and the overall grabbing capacity of the anthropomorphic mechanical arm is large.
Owner:CHINA ORDNANCE EQUIP GRP AUTOMATION RES INST CO LTD

Integrally constructed large-span steel truss metal roof module and splicing method

The invention provides an integrally constructed large-span steel truss metal roof module, which relates to a main body steel truss and comprises a lower layer main purline, a profiling bottom plate, an air isolation layer, heat preservation rock wool, a waterproof coiled material, an upper layer main purline, an upper layer purline and a vertical lockrand steel plate. The invention further provides a splicing method of the integrally constructed large-span steel truss metal roof module. The waterproof, anti-seepage and wind uplift-resistant capacities of joints between modules of the metal roof system are guaranteed, in view of the fact that installation errors exist when the roof is installed, so that the shape finding of the roof is difficult, the form that a new purline support is matched with a purline adjuster is adopted for the roof system, and accurate shape finding and easy splicing of the roof system are achieved; the profiling bottom plate, the gas insulation layer, the heat preservation rock wool, the waterproof coiled material, the vertical lockrand steel plate and the decorative plate are all in a step shape from low to high, when metal roof modules are spliced on site, splicing can be conducted from the middle, and a good operation space is provided for constructors.
Owner:BEIJING URBAN CONSTR GROUP +1

Insulating forearm mechanism suitable for aerial work platform with voltage smaller than or equal to 66KV

The utility model provides an insulating forearm mechanism suitable for an aerial work platform with the voltage smaller than or equal to 66KV. The small arm mechanism comprises an insulating main arm, two insulating pull rods parallel to the insulating main arm and a working bucket installed at the free end of the insulating main arm, one end of the insulating main arm is rotationally connected with the arm support mechanism through a first connecting frame, the other end of the insulating main arm is rotationally connected with a connecting support, and the two insulating pull rods are arranged above the insulating main arm in parallel; one end is rotatably connected with the arm support mechanism through a first pull rod rotating shaft, the other end is rotatably connected with the connecting support through a second pull rod rotating shaft, a small arm variable-amplitude cylinder is arranged between the first pull rod rotating shaft and the first connecting support, and the working bucket is rotatably installed at the free end of the insulating main arm through a leveling support. According to the utility model, any insulation distance of the working bucket can be ensured to be more than 300mm, so that the working bucket achieves an insulation effect; the utility model can flexibly act when working in a specific or narrow space, and is simpler in structure and easy to weld.
Owner:HUBEI GAOMAN HEAVY IND TECH CO LTD

Pipe arranging machine

The utility model relates to a pipe racking machine which comprises a cofferdam assembly, a track assembly and a gantry crane assembly, and the track assembly comprises a track fixing frame, a track folding frame and a folding lug base assembly; the folding lug base assembly comprises a fixed lug base, a movable lug base and a rotating pin shaft set, the fixed lug base is fixed to the rail fixing frame, the movable lug base is fixed to the rail folding frame, the folding lug base assembly can achieve bidirectional overturning of the rail folding frame relative to the rail fixing frame, and in the oil pipe feeding and discharging process, a first pin shaft located on the inner side is detached; the rail folding frame is outwards turned and opened by taking the second pin shaft as a rotating center line, so that the oil pipe is convenient to load and unload, and interference with the rail folding frame in the loading and unloading process is avoided; in the transportation process of the pipe racking machine, the second pin shafts located on the outer side are detached, the rail folding frames on the two sides are closed inwards with the corresponding first pin shafts as the rotation center lines, the overall size of the pipe racking machine is reduced, transportation and carrying are convenient, and the transportation cost is reduced.
Owner:DONGYING RUIAO IND & TRADE CO LTD

Electroscope for cable removal

ActiveCN117161466BReduce the risk of demolition operationsprevent demolition
The application discloses a kind of electric cable removal with electricity testing wire cutting pliers, it is related to wire cutting pliers technical field, including clamp jaw body, clamp jaw body includes two jaw arms, the middle part of two jaw arms is crossed and is hinged, two jaw arms are equipped with cutting edge in the side of each other close, one end of two jaw arms is connected with handle, one handle is equipped with inductive high-low voltage electricity tester, controller, alarm and driver, locking rod is equipped on driver;When inductive high-low voltage electricity tester detects that the cable clamped by two jaw arms has voltage signal, controller controls alarm to issue alarm on one hand, controller controls driver to drive locking rod to abut on another handle on the other hand, not only prevent two handles from each other close, also prevent two jaw arms from cutting cable.The application not only can test whether cable is live, but also can mechanically prevent cutting cable when cable is live, reduce the risk of cable removal operation.
Owner:STATE GRID SHANDONG ELECTRIC POWER CO CONSTR CO +1

Portal crane bridge

The utility model relates to the technical field of cranes, and discloses a gantry crane bridge which comprises two underframes, supporting legs are arranged on the underframes, an upper truss is jointly connected to the two supporting legs, a lower truss is rotationally connected to the upper truss, the lower truss is arranged on the side, facing the underframes, of the upper truss, and the lower truss is arranged on the side, facing the underframes, of the lower truss. A trolley frame is installed on the lower truss, a driving motor is installed on the bottom frame, the output end of the driving motor is connected with an expansion mechanism, the driving motor can drive the expansion mechanism to rotate, the expansion mechanism is arranged in the vertical direction, and the two ends of the lower truss are connected with the expansion mechanism. The device solves the problem that the bearing capacity is influenced due to small supported area when the lower truss rotates, and ensures the bearing capacity of the crane while enlarging the allocation and transportation action space.
Owner:JIANGSU TAIZHIXING REDUCER CO LTD

Movable tea bar machine

The invention relates to a tea bar machine, in particular to a movable tea bar machine. A movable tea bar machine comprises a main body and a base plate, and a barreled water storage chamber is arranged on the lower middle portion of the main body; the chassis is positioned at the bottom of the barreled water storage chamber; a roller group is arranged at the bottom of the chassis and is provided with a locking rod; and the locking rod extends out of one side of the chassis through the control block. The roller group comprises two front wheels and two rear wheels; the front wheel and the rear wheel are respectively provided with a locking piece, and the locking rod is located above the locking piece of the rear wheel. The chassis comprises a frame and a movable plate, the frame is fixed to the bottom of the barreled water storage chamber, and the movable plate is movably installed on the frame; a groove is formed in the frame, and the movable plate is arranged in the groove; and the roller group is mounted on the movable plate. The operation efficiency can be improved, and the operation difficulty can be reduced.
Owner:QINGDAO AUCMA DOMESTIC ELECTRICAL APPLIANCE +1

A robotic end-to-end grinding and polishing equipment and method for complex curved surface parts with rapid model changeover.

PendingCN122077673AIncrease working spaceAvoid joint overshootBelt grinding machinesAutomatic grinding controlPolishingFloating platform
This invention belongs to the field of robotic grinding and polishing technology, and specifically discloses a robotic end-to-end grinding and polishing equipment and method for complex curved surface parts with rapid changeover. It includes a robot, a loading and unloading unit including loading and unloading trays, with workpieces mounted on quick-change fixtures, a loading and unloading gripping compensation unit including a compensation base, the compensation base having an internally hollow compensation protective cover, the compensation base and the compensation protective cover forming an air cavity, a compensation floating platform within the air cavity, one end of the compensation floating platform passing through the compensation protective cover and fixedly connected to a compensation flange, the compensation flange having a fixed loading and unloading compensation platform, the loading and unloading compensation platform being fixedly connected to the loading and unloading trays, and a belt grinder for rough and fine grinding of workpieces transferred by the robot. This invention, while ensuring high-precision machining consistency, greatly enhances the system's operational stability, process adaptability, and overall equipment lifespan.
Owner:HUAZHONG UNIV OF SCI & TECH

Construction method for reconstructing and expanding four-arch tunnel into double-layer tunnel

The invention relates to the technical field of tunnel engineering, in particular to a construction method for reconstructing and expanding a four-arch tunnel into a double-layer tunnel, which comprises the following steps of: performing traffic closing construction on a third tunnel and a fourth tunnel, and using a first tunnel and a second tunnel as traffic during construction; temporary reinforcement measures are constructed in the first tunnel and the second tunnel; excavating the third tunnel to form an upper-layer tunnel; a reinforced concrete plate and a second support pile of a lower step on the right side of the tunnel are constructed for the upper-layer tunnel; a short side wall and an upper-layer tunnel secondary lining are constructed, so that the upper-layer tunnel is completely communicated; a lower-layer tunnel is excavated, and a lower-layer tunnel lining structure is constructed; and the tunnel middle partition plate is poured, and construction of the double-layer tunnel is completed. The technical problem that in the prior art, a technological method capable of achieving construction from the four aspects of surrounding site limitation, construction deformation control, construction organization arrangement and old tunnel reinforcement measures does not exist is solved.
Owner:CHINA RAILWAY 18TH BUREAU GRP CO LTD +3

Solar cell defect detecting and placing platform

The utility model discloses a solar cell defect detecting and placing platform which comprises a shell box door, a platform base, a mechanical arm, a solar cell placing platform, an image collecting and processing device, an end effector, a suction cup, a display screen and a box door handle. The shell box door is installed on a sliding rail of the platform base. And an adjustable sliding block is arranged on the sliding rail. And a mechanical arm chassis is fixedly mounted on the upper surface of the platform. A rotating disc is arranged on the mechanical arm chassis, a chassis connector is arranged on the rotating disc, a motor is arranged on the chassis connector, and a connecting lower arm is arranged on the motor. The lower arm is provided with an arm connector so as to be connected with the upper arm, and a motor is arranged at the joint. According to the utility model, the front arm rotates under the control of the motor so as to adjust the angle between the image acquisition device and the solar cell. And when facing solar cells with different sizes, the solar cell positioning device can be adjusted to a proper position, so that the operation space of image acquisition is large, the positioning precision is high, and the operation flexibility is higher. And the mechanical arm uses an end effector to realize automatic placement of the solar cells, so that the detection efficiency is improved.
Owner:XIJING UNIV

Jacking translation tool suitable for wind power gear box

The utility model discloses a jacking translation tool suitable for a wind power gear box, which relates to the technical field of wind power gear box maintenance equipment and comprises a jacking assembly and a translation assembly which are arranged in a cabin. The translation assembly comprises a fixed bottom plate arranged in the cabin, two supporting frames are symmetrically arranged on the top face of the fixed bottom plate, and limiting tools are integrally arranged at the upper ends of the supporting frames and slidably connected with the wind power gear box. The jacking assembly comprises a plurality of first hydraulic telescopic columns and a plurality of second hydraulic telescopic columns which are arranged on the top face of the fixed bottom plate. According to the jacking translation tool suitable for the wind power gear box, the technical problem that maintenance operation on a tower is difficult to complete under the condition that a cabin is small is solved. The wind power gear box is moved by a certain distance in the cabin through the limiting tool, the wind power gear box is lifted to the designated height through the first hydraulic telescopic rod and the second hydraulic telescopic rod, the workable space on a tower is enlarged, and the maintenance range of the wind power gear box is widened.
Owner:CHONGQING GEARBOX

Treatment vehicle with folding storage table

The utility model relates to the field of treatment vehicles, in particular to a treatment vehicle with a folding storage table. Comprising a storage table, and the storage table is connected with a treatment vehicle body through a folding mechanism; the treatment vehicle body is provided with an operation table located at the top, the storage table is hinged to the folding mechanism so that the storage table can turn over around the folding mechanism, and a first station which is hung on one side of the operation table and is in a storage state and a second station which is erected above the operation table and used for expanding an operation space are correspondingly arranged before and after turning over; the folding mechanism comprises a first part and a second part in sliding fit with the first part, and the first part and the second part are connected with the treatment vehicle body and the storage table respectively. According to the medical vehicle, the storage table connected through the folding mechanism is additionally arranged on the basis of an existing medical vehicle, so that when the storage table is located at the first station, the appearance size of the medical vehicle is not greatly changed, the medical vehicle can be conveniently transferred, when the storage table is located at the unfolded second station, the operation space of the operation table is increased, and medical workers can work more conveniently.
Owner:SUZHOU SCI&TECH TOWN HOSPITAL

Consolidation device of swivel bridge upper bearing platform

The utility model relates to the technical field of bridge construction, in particular to a consolidation device of a swivel bridge upper bearing platform, which comprises a lower bearing platform, an upper bearing platform and an abutment, spherical hinges are arranged in the middles of the lower bearing platform and the upper bearing platform, and an outer jack boosting embedded seat is arranged on one side of an inner jack boosting embedded seat. According to the swivel bridge spherical hinge system, the stress structure of the swivel bridge spherical hinge system is not affected by omitting a sand bucket, investment cost can be reduced, labor used in the working procedure is directly reduced in the construction process, the construction period is shortened, the construction efficiency is improved, and the construction cost is reduced. The operation space is optimized, construction interference is reduced, the construction process is simpler and more convenient, the construction speed is increased, meanwhile, the construction period and the construction cost are saved, the steel member machining period is shortened, the overall structure is convenient to install and operate on site, and therefore the construction cost is reduced, and the construction period is shortened.
Owner:CHINA RAILWAY ELECTRIFICATION ENGINEERING GROUP CO LTD

Construction method for removing rock pillar in super-large section hard rock tunnel in deep underground space

The invention provides a construction method for removing a rock pillar in a deep underground space super-large section hard rock tunnel, which comprises the following steps of: firstly, establishing a tunnel three-dimensional model by utilizing finite element software Midas GTS, determining a safety distance from a secondary lining to a middle rock pillar in a station excavation process through simulation analysis, dividing a tunnel section into an upper step, a middle step and a lower step according to height, and constructing a tunnel model; each step is further divided into a left pilot tunnel, a middle pilot tunnel and a right pilot tunnel. The construction process comprises the steps of top lifting, main body tunnel upper step left and right pilot tunnel excavation and support, middle step left and right pilot tunnel excavation and support, upper step middle pilot tunnel excavation and support, middle step middle pilot tunnel excavation and support, lower step left and right pilot tunnel excavation and support, lower step middle pilot tunnel excavation and support and inverted arch and arch wall lining construction. According to the construction method, the pilot tunnel construction sequence is optimized, space is provided for mechanical excavation, the problem that the upper step and the middle step of the core rock pillar cannot be mechanically trimmed is solved, and the construction efficiency is improved. Manual and automatic monitoring is adopted in the whole process to ensure tunnel safety and stability. The construction risk is effectively reduced, carbon emission and dust pollution are reduced, the method is suitable for hard rock geological tunnel construction with good self-stability, and remarkable social benefits are achieved.
Owner:CHINA COMMUNICATIONS CONSTRUCTION +9

Intelligent construction management method and system based on digitization

ActiveCN119599611AImprove efficiencyIncrease working spaceConstruction managementTesting Methods
The invention relates to the technical field of construction management, in particular to an intelligent construction management method and system based on digitization. An intelligent construction management method based on digitization comprises the following steps: S1, based on a preliminarily designed BIM model, obtaining all to-be-adjusted pipeline areas in the BIM model and alternative adjustment areas of the to-be-adjusted pipeline areas, and obtaining pipeline distances between the to-be-adjusted pipeline areas and the alternative adjustment areas by using a pipeline distance prediction formula, an operation space is obtained based on the pipeline spacing; s2, based on the operation space of the to-be-adjusted pipeline area and the alternative adjustment area, an area adjustment formula is used for obtaining an area adjustment value, the to-be-adjusted pipeline area or the alternative adjustment area is adjusted according to the area adjustment value, and a first adjustment area is obtained. The method is based on the BIM model, the region adjustment formula and the region screening formula are combined, the accuracy of pipeline region adjustment is ensured, and it is ensured that follow-up robot operation has enough operation space.
Owner:ZHEJIANG URBAN & RURAL PLANNING DESIGN INST

Cargo compartment door opening structure for van type logistics vehicle

The utility model discloses a cargo compartment door opening structure for a van-type logistics vehicle, which belongs to the technical field of van-type logistics vehicles and comprises a box body, two sides and the rear side of the box body are respectively hinged with a side door I, a side door II and a rear door, one side of the lower end of the box body is provided with a groove II, and the box body is in sliding connection with a limiting shaft at the upper end of the groove II. The limiting shafts are slidably connected with symmetrical limiting devices, the symmetrical limiting devices are slidably connected with extension plates, and through the arrangement of the two side doors and the rear door and different using methods of the two side doors and the rear door, the cargo compartment door opening structure for the van type logistics vehicle is more convenient to use; the second side door can be better fixed through the fixing device on one side of the lower end of the box body, when the second side door is opened, the rotating shaft can serve as a supporting column for certain sun shading or rain sheltering, and when the second side door does not need to be completely opened, a triangular head of the limiting device can be matched with limiting grooves in different positions, so that the second side door is more convenient to use. And the side door II is opened to different degrees.
Owner:CHONGQING LONGTONG TECH CO LTD

Disposable swallowing assessment nursing bag

ActiveCN222032608UIncrease working spaceSurgical furnitureSensorsNursing careStructural engineering
The utility model discloses a disposable swallowing assessment nursing bag which comprises a box body, the top of the box body is rotationally connected with a cover plate, a lockable lock body is arranged outside the cover plate and the box body, and two first storage grooves, two second storage grooves and a food storage groove are formed in the box body; and the expansion assembly comprises two sliding grooves, and the two sliding grooves are both formed in the cover plate. According to the utility model, firstly, towels, gloves, cups and other tools which need to be used are respectively placed in the two first storage grooves and the two second storage grooves, meanwhile, food is placed in the food storage groove, when evaluation operation is carried out, fingers can be placed in the clamping grooves, and then the expansion plate is poked, so that the evaluation operation is carried out. And the expansion plates are expanded outwards from the interior of the cover plate, and at the moment, the two expanded expansion plates can be used for bearing evaluation articles, so that the operation space is improved, and evaluation personnel can carry out evaluation operation conveniently.
Owner:喻静

A control method and control system for an intelligent industrial robot

A control method and control system for an intelligent industrial robot, wherein a second clamping part is arranged in the middle of the first clamping parts of the workstation box on both sides, and a weighing element is arranged inside a transmission line; the workstation box is transmitted on the transmission line, and an industrial robot is arranged on the left and right sides of each transmission line, and the industrial robot between two adjacent transmission lines is a mobile robot shared by the two adjacent transmission lines; when the workstation box is not overweight, the industrial robot as the main operating machine of the transmission line is controlled to grasp the workstation box that is not overweight through the second clamping part in the middle, and when the workstation box is overweight, the industrial robot as the main operating machine of the transmission line and the industrial robot operating the auxiliary machine are controlled to grasp the overweight workstation box through the first clamping parts on both sides. The present invention can reduce the number of industrial robots and the space they occupy, reduce the probability of failure of industrial robots, and reduce maintenance costs.
Owner:BENSEN INTELLIGENT EQUIP (SHANDONG) CO LTD

High-bridge plug-in structure metering box zero-ground bar

The utility model provides a high-bridge plug-in structure metering box zero-ground bar, which relates to the technical field of connector bars and comprises a zero-ground bar main body, supporting legs, wire inlet grooves and fixing holes, the supporting legs are arranged at four corners of the bottom of the zero-ground bar main body, the wire inlet grooves are arranged in the zero-ground bar main body, and the fixing holes are arranged in the wire inlet grooves. Elastic positioning clamping pieces are symmetrically arranged in the hollow groove body at the positions of the first wire inlet jack and the second wire inlet jack, a plurality of fixing holes matched with the positions of the wire inlet grooves are formed in the top of the zero-ground bar main body, the fixing holes are linearly arranged in the length direction of the wire inlet grooves, and limiting blocks are arranged in the fixing holes in a sliding manner; according to the utility model, the top of the zero-ground bar main body is provided with a plurality of fixing holes communicated with the hollow groove body in the wire inlet groove, so that a plurality of limiting blocks can be synchronously driven by screwing one fixing bolt to synchronously fix the wiring terminals in the wire inlet groove at multiple positions; the problem of wiring failure caused by screw loosening or wiring terminal fracture in the prior art is solved, and the wiring stability of the zero bar is effectively improved.
Owner:PANJIN POWER SUPPLY COMPANY OF STATE GRID LIAONING ELECTRIC POWER SUPPLY +1

A flexible PCB board raw material unwinding device

ActiveCN118220883BIncrease working spacesave work space
The present invention discloses a flexible PCB board raw material unwinding device, which includes a frame, a pair of coil shafts and a receiving plate, wherein the frame is located at the input end of a production device used in conjunction with the unwinding device, and the production device is used to extract raw materials from the unwinding device; both coil shafts are rotatably mounted on the frame, and each coil shaft is used to place the raw materials; the receiving plate is mounted on a side of the frame away from the production device, and both coil shafts are located between the production device and the receiving plate; a stabilizing component for stabilizing the raw materials on each coil shaft on the receiving plate is mounted on the receiving plate. The present application has the effect of reducing the spacing between two adjacent rows of flexible circuit board production lines and improving the utilization rate of the same space in the factory.
Owner:GUANGZHOU JULONG PCB EQUIP CO LTD

Webbed-foot bionic robot based on intelligent detection and feedback of crop information and its use method

The present invention provides a bionic robot with concave webbed feet based on intelligent detection and feedback of crop information and a method for using the same. The bionic robot with concave webbed feet includes a support platform, an intelligent bionic concave webbed foot is installed below the support platform, and a detachable intelligent fertilization device, a GreenSeeker detector, a hyperspectral imager, a GreenSeeker conversion control device, an intelligent identification control device, a Beidou navigation system, a wind direction sensor, a wind speed sensor, an energy supply device, an energy storage device, and a laptop are also installed on the support platform. The present invention can simultaneously realize the one-time real-time collection, processing, decision-making and feedback of multiple information such as crop image information, spectral information, distance information, and climate information, and control the corresponding feedback device to realize fertilization or spraying of crops on targets, simplifying the complexity of traditional operating machines and tools, improving the efficiency of crop information detection, and promoting the development of smart agriculture and smart agricultural machinery.
Owner:NANJING AGRICULTURAL UNIVERSITY