Dam structure with permanent and temporary combined multifunctional drainage box culvert and construction method thereof

A combination of permanent and permanent, multi-functional technology, applied in dams, water conservancy projects, barrages, etc., can solve problems such as large impact of external rainfall, and achieve the effects of simplifying construction, saving investment, and optimizing operation

Active Publication Date: 2019-02-22
POWERCHINA HUADONG ENG COPORATION LTD
View PDF8 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the seepage monitoring of concrete face rockfill dams is basically to set up retaining walls and water measuring weirs at the downstream dam foot to collect and measure seepage water, but this method has the problem that it is greatly affected by external rainfall.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Dam structure with permanent and temporary combined multifunctional drainage box culvert and construction method thereof
  • Dam structure with permanent and temporary combined multifunctional drainage box culvert and construction method thereof
  • Dam structure with permanent and temporary combined multifunctional drainage box culvert and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0045] like figure 1 , figure 2 As shown, this embodiment is a dam structure with permanent combined multi-functional drainage box culvert, which has a concrete face rockfill dam body 2 arranged on the river channel 1, and the dam foundation of the dam body 2 and its upstream and downstream section Within the range, a drainage box culvert 6 across the dam foundation is arranged by trenching the foundation in the rock dam foundation. The upstream end and downstream end of the drainage box culvert 6 are arranged near the bank, and pass through the lowest riverbed part of the foundation surface of the plinth 10, and the remaining parts are arranged according to the topographic and geological conditions and construction conditions along the way, and an appropriate drainage slope is guaranteed. The upstream end of the drainage box culvert 6 forms a water inlet through a concrete shaft 5, the upstream water inlet is connected to the upstream channel 1 of the dam body 2 through the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a dam structure with a permanent and temporary combined multifunctional drainage box culvert and a construction method thereof and aims at providing the dam structure with thepermanent and temporary combined multifunctional drainage box culvert and the construction method thereof which have the advantages of convenient construction and low cost in order to achieve the construction flow guide function, the foundation pit reverse drainage function, the dam body permanent drainage function and the dam body seepage water collection and measurement function. According to the technical scheme provided by the invention, the dam structure is provided with a concrete face rockfill dam body located on a river channel. A closure cofferdam is arranged on a dam body upstream river channel. The river channel on the upstream of the closure cofferdam communicates with the dam body downstream river channel through an intake canal, a concrete shaft, the drainage box culvert andan outlet canal in sequence. The drainage box culvert is arranged below the dam foundation surface of the dam body and transversely penetrates through the dam body. The dam structure with the permanent and temporary combined multifunctional drainage box culvert and the construction method thereof are suitable for construction flow guide and dam body drainage of a concrete face rockfill dam project of which the flow guide scale is small and little bed-load sediment exists on a river bed, such as, a reservoir on a pumped storage power generation station with the small rainwater collection area.

Description

technical field [0001] The invention relates to a dam structure with permanent combined multifunctional drainage box culvert and a construction method thereof. It is suitable for construction diversion and dam body drainage of concrete face rockfill dam projects with small diversion scale and little moving sediment in the river bed, such as the upper reservoir of pumped storage power station with small rain collection area. Background technique [0002] Concrete face rockfill dam construction diversion generally adopts the scheme of cofferdam plus diversion tunnel, while the rainwater collection area of ​​the upper reservoir of the pumped storage power station is generally small, and the scale of diversion flood is small. Although the diversion of tunnel is reliable, it is expensive Relatively high. [0003] As we all know, due to the relatively low foundation pit of the concrete face rockfill dam, there is generally a reverse seepage problem during the construction period,...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02B7/06E02B8/06
CPCE02B7/06E02B8/06
Inventor 朱安龙徐亮金珍宏王勤
Owner POWERCHINA HUADONG ENG COPORATION LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products