A construction method and concrete technology, which is applied in water conservancy projects, hydroelectric power stations, hydroelectric power generation, etc., can solve problems such as the inability to install and construct gate slots and gates, and achieve the goals of overcoming insufficient traffic conditions, shortening construction time, and saving costs Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] The specific implementation of the construction method of the present invention will be further described in detail below in conjunction with the accompanying drawings of the description.
[0039] Such as Figure 1 ~ Figure 3 Shown, construction method of the present invention specifically comprises the following steps:
[0040] Step 1. Use bulldozers and rammers to level and intercept the construction work surface;
[0041] Step 2. Pour the concrete prefabricated body foundation on the working surface. The longitudinal section of the concrete prefabricated body foundation is a trapezoidal section with a width of 6m and a length of 9m. The Φ20@200 steel mesh is arranged inside to enhance the overall strength of the concrete foundation, and the concrete prefabricated body foundation guides the direction of the open channel to be in a downhill state, so that the concrete precast body foundation slides towards the open channel;
[0042] Step 3, laying a sliding platform ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Spacing | aaaaa | aaaaa |
| Length | aaaaa | aaaaa |
| Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 