A short-term planning method for multi-level cascaded storage groups with one storage for peak load regulation

A multi-level and cascaded technology, applied in the direction of calculation, calculation model, fuzzy logic-based system, etc., can solve the problems of mathematical programming methods such as the timeliness is not strong, to achieve the improvement of timeliness is not strong, easy to operate, high calculation efficiency Effect

Active Publication Date: 2021-09-24
CHINA SOUTHERN POWER GRID COMPANY +1
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The technical problem to be solved by the present invention is to provide a short-term planning method for one-storage and multi-level cascade storage group undertaking peak-shaving tasks, and to propose a "one-storage and multi-level" method based on fuzzy identification of "peak and valley periods" and improved cascade energy storage A rapid generation method for the short-term peak-shaving plan of cascade hydropower station groups, in order to reasonably arrange the power generation plan of the upstream and downstream power stations, balance the relationship between peak-shaving and energy storage, and solve the problem that the mathematical planning method is not time-sensitive

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A short-term planning method for multi-level cascaded storage groups with one storage for peak load regulation
  • A short-term planning method for multi-level cascaded storage groups with one storage for peak load regulation
  • A short-term planning method for multi-level cascaded storage groups with one storage for peak load regulation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] The specific implementation manner of the present invention will be further described below in conjunction with the accompanying drawings and technical solutions.

[0024] The goal of the short-term peak-shaving model of the hydropower station group of the present invention is to maximize the energy storage at the end of the year and meet the total daily power demand of the cascade, so as to minimize the power generation flow of the leading power station, make full use of the high water head of the downstream power station to generate electricity, and pass the typical peak-shaving curve Realize the purpose of cascade peak regulation.

[0025] The objective function is as follows:

[0026] The formula for calculating the energy storage value of a single hydropower station is as follows:

[0027]

[0028] The formula for cascade energy storage is as follows:

[0029]

[0030] In the formula: i represents the number of the power station from upstream to downstream,...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the field of power grid planning and dispatching operation, in particular to a short-term planning method for one-storage multi-level cascaded storage groups undertaking peak-shaving tasks. First, according to the distribution characteristics of the power grid load curve, the fuzzy semi-step membership function is used to divide the peak and valley periods, and the peak-to-valley ratio of the power station is adjusted to determine the typical peak-shaving curve of the power station; then, the particle swarm optimization algorithm is used to solve the process of power distribution between plants; finally, the calculation process In order to reduce the occurrence of abandoned water, the adjustment strategy of abandoned water is adopted to correct the output process of each power station to minimize the abandoned water. The method of the invention realizes output matching of upstream and downstream power stations, balances the relationship between peak regulation and energy storage, and improves the problem of poor timeliness caused by complex constraints in short-term peak regulation. The method of the invention has a clear principle, is easy to operate and has high calculation efficiency, and provides a practical new idea for solving the actual project scheduling problem.

Description

technical field [0001] The invention relates to the field of power grid planning and dispatching operation, in particular to a short-term planning method for one-storage multi-level cascaded storage groups undertaking peak-shaving tasks. [0002] technical background [0003] The ever-increasing load peak-to-valley difference and the continuous production of intermittent energy sources have brought huge peak-shaving pressure to the short-term dispatching of the power grid. As a high-quality peak-shaving power source, hydropower plays an important role in ensuring the safe, stable and economical operation of my country's power system. play an increasingly important role. Most of the river basins in my country adopt the "one reservoir multi-stage" or "multi-reservoir multi-stage" development, that is, there are one or more leading power stations with good regulation capacity in the upstream, and multiple power stations with small storage capacity, high water head and poor regula...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/06G06Q50/06G06N3/00G06N7/02
CPCG06N3/006G06N7/02G06Q10/0631G06Q50/06
Inventor 李树山李崇浩吴慧军唐红兵王凌梓刘映尚唐卓尧程春田廖胜利刘杰
Owner CHINA SOUTHERN POWER GRID COMPANY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products