Advanced support system and method for working-face
A technology of mining face and advance support, which is applied in mining equipment, earthwork drilling, bolt installation, etc., can solve problems affecting the safe and efficient production of the working face, roof sinking roof accidents, roof integrity damage, etc., to achieve Improve the strength of advanced support, improve production efficiency, and facilitate construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Such as figure 1 with 2 As shown, the present embodiment provides an advance support system for mining face, including an advance reinforcement support system; the advance reinforcement support system includes two rows of grouting anchor cables 1 arranged on the roof 4 along the roadway extension direction and two rows of grouting anchor cable trusses 2; two adjacent grouting anchor cables 1 along the roadway extension direction are connected through the grouting anchor cable trusses 2. The grouting anchor cable truss 2 is an I-beam with two perforations; the two perforations of the grouting anchor cable truss 2 respectively pass through two adjacent grouting anchor cables 1 in the direction of roadway extension and are fixed on the On the top plate 4 ; two rows of grouted anchor cable trusses 2 are arranged on the top plate 4 in a three-flower pattern. Among them, the first row of grouting anchor cable trusses 2 is 60.4m away from the side of the roadway, the second ...
Embodiment 2
[0034] The difference between this embodiment and Embodiment 1 is that: the advanced support system of the mining face also includes a mine pressure observation system; the mine pressure observation system includes an online mine pressure observation system, mine pressure manual observation points, roof layer instrument; the mine pressure on-line observation system includes a borehole stress gauge, a roof displacement sensor, and an anchor cable stress gauge:
[0035] (1) Drilling stress gauge
[0036] A borehole stress gauge is arranged every 25m on the side of the roadway 6, the type is digital, and the change data is automatically transmitted, which can be analyzed on the ground, and the observation frequency is real-time observation.
[0037] (2) Anchor cable stress gauge
[0038] Install 2 anchor cable stress gauges at intervals of 25m to monitor the pressure on the roof 4, and set early warning values for real-time early warning, and take emergency measures immediatel...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

