A complete set of construction method for arch culvert with mobile hydraulic trolley
A hydraulic trolley and mobile technology, applied in the field of arch and culvert construction, can solve the problems of increasing construction difficulty and cycle, poor overall straightness of arch and culvert, and reduced construction efficiency, so as to ensure strength and stability and improve construction efficiency And, the effect of improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] In this embodiment, a complete set of construction method for arch and culvert with mobile hydraulic trolley, including establishing a track, using a side wall formwork trolley to construct the side wall along the track, and using a vault formwork trolley to follow the track on the foundation of the side wall For the construction of the vault, the side walls are connected to the vault to form an arch culvert.
[0041] Taking the length direction of the track as the benchmark is conducive to ensuring the straightness of the side walls, vaults, and the overall arch culvert formed by the side walls and vaults, so that the accuracy of the completed arch culvert is high. Prioritize the construction of the side walls, which can provide a foundation for the construction of the vault and reduce the positioning work during the construction of the vault. And the side wall has no closed structure, which can avoid interference between the construction structure and the construction...
Embodiment 2
[0043] In this embodiment, a mobile hydraulic trolley arch culvert construction method includes the following steps:
[0044] Step S1: Prepare the foundation pit used as the construction site, so that the foundation pit meets the construction requirements.
[0045]Step S2: Construction of culvert foundation.
[0046] Step S3: Assemble the side wall formwork trolley, including assembling the side wall running system on the culvert foundation, assembling the side wall gantry system on the side wall running system, and assembling the side wall formwork system on the side wall formwork trolley.
[0047] Such as figure 1 , figure 2 , image 3 As shown, the running system includes two side wall rails 14 arranged in parallel.
[0048] The side wall door frame system includes two side wall door frame longitudinal systems respectively slidingly arranged on the two side wall rails 14 and a side wall door frame transverse system for connecting the two side wall door frame longitudin...
Embodiment 3
[0063] Such as figure 1 As shown, on the basis of the above embodiments, in this embodiment, the side wall formwork system includes side wall outer formwork 9, side wall A, which are symmetrically distributed on the symmetrical plane of side wall rail 14 and arranged sequentially from outside to inside. The inner mold 11 and the side wall B inner mold 13 located between the two side wall gantry longitudinal beams 1 . Such as Figure 4 As shown, there are side wall A end molds 18 located at both ends of the side wall A inner mold 11 between the side wall outer mold 9 and the side wall A inner mold 11 . The side wall A pouring space is formed around the side wall outer form 9 , the side wall A inner form 11 and the side wall A end form 18 . Such as Figure 5 As shown, the side wall B end mold 19 located at both ends of the side wall B inner mold 13 is arranged between the side wall B inner mold 13 and the side wall B inner mold 13, and the side wall B inner mold 13 is connect...