A construction method for backfilling the piston air duct in the shield section
A construction method, piston wind technology, applied in tunnels, earthwork drilling, tunnel lining, etc., can solve problems such as unsatisfactory joint construction period and inability to carry out end reinforcement, so as to reduce construction risks, shorten construction period, and reduce construction cost Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0029] Such as Figure 1-2 As shown, a construction method for backfilling the piston air duct in the shield section includes the following steps:
[0030] S1. Waterproof and reinforced concrete for the base plate 6 of the construction piston air duct;
[0031] S2. Concrete guide platform 7 of left and right line shield machine;
[0032] S3. Measure and stake out the shield passing range and the newly added steel support position;
[0033] S4. Expand the sc...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com