Method and system for preparing short-term multi-objective power generation plan of hydropower station for power grid peak regulation

A technology for power generation planning and hydropower stations, applied in system integration technology, information technology support systems, calculations, etc., can solve problems such as abandoning water for peak regulation, ignoring the overall coordination relationship between power generation and peak regulation, and achieving simplified and efficient algorithm design The effect of solving

Active Publication Date: 2021-08-31
HUAZHONG UNIV OF SCI & TECH +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the above defects or improvement needs of the prior art, the present invention provides a short-term multi-objective power generation plan preparation method and system for hydropower stations for power grid peak regulation, thereby solving the problem that the existing generation preparation method ignores both power generation and peak regulation The overall coordination relationship among them leads to technical problems such as water abandonment and peak shaving

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and system for preparing short-term multi-objective power generation plan of hydropower station for power grid peak regulation
  • Method and system for preparing short-term multi-objective power generation plan of hydropower station for power grid peak regulation
  • Method and system for preparing short-term multi-objective power generation plan of hydropower station for power grid peak regulation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] In order to make the objectives, technical solutions and advantages of the present invention, the present invention will be described in further detail below with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are merely intended to illustrate the invention and are not intended to limit the invention. Further, the technical features according to each of the various embodiments described below can be combined with each other as long as they do not constitute a collision between each other.

[0037] The present invention is applied to the grid and consider more than the minimum charge variance and Cascade total generating capacity of maximum two target models, which can effectively reduce the system pressure is peaking, improving the quality of power supply. Grid can secure stable economic operation. Furthermore, the present invention is effective to improve the original multi-objective particle swar...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a short-term multi-objective power generation planning method and system for power grid peak-shaving hydropower stations. Firstly, a short-term multi-objective power generation planning model for cascade hydropower stations is constructed; the economic operation mode of the power station is determined according to the input conditions; Particles, and determine the individual extremum of each particle based on the objective function value of each particle, save some particles that are not dominated by each other in an external file set; update the position and speed of each particle, randomly select some particles for polynomial mutation, and repair Infeasible solution, recalculate the objective function value of each particle; update the individual extremum of each particle based on the recalculated objective function value of each particle; update the external file set according to the dominance relationship of the particle and the crowding distance, if it meets the preset If the termination condition is met, the external archive set is output, and then the global extremum is obtained. The invention can effectively reduce the peak regulation pressure of the system and improve the power supply quality. The power grid can operate safely and stably economically.

Description

Technical field [0001] The present invention is in the field of scheduling RESOURCES, more particularly, to a multi-objective response to short-term power generation planning method and system of power peaking station. Background technique [0002] With the continuous expansion of the rapid development of my country's power grid construction and grid-scale, grid security needs stable economic operation of increasingly high power system peaking capacity shortage problem has become increasingly prominent. Short-term generation schedule of cascaded hydropower preparation is an important part of cascade control center basin water transfer department, are "on Water power" mode. It is usually rung total generating capacity, power generation efficiency optimum or maximum peaking benefit as the goal, considering the short-term runoff forecasting, constrained power system load changes and power plant units maintenance scheduling, output vibration zones, so as to effectively utilize and re...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q50/06G06N3/00
CPCG06N3/006G06Q50/06Y02E40/70Y04S10/50
Inventor 莫莉陈广才谌沁高新稳王永强舒生茂邹义博彭璐向益奇
Owner HUAZHONG UNIV OF SCI & TECH
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More