Scheduling device and method for cooperative operation of video monitor equipment cluster
A collaborative work and video monitoring technology, applied in closed-circuit television systems, signal transmission systems, transmission systems, etc., can solve problems such as inability to achieve accuracy and reliability, abnormal reading of command signals, and lack of integrity of command groups, and achieve Avoid abnormal equipment actions, solve accurate scheduling, and reduce the effect of abnormal jitter
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] This embodiment discloses a scheduling device for collaborative work of video surveillance equipment clusters, such as figure 1 As shown, it includes the original monitoring information collection part, early warning target analysis and recognition part, multi-channel signal receiving unit, comprehensive cooperative dispatching unit, status group logic unit, target confirmation equipment and other monitoring equipment.
[0031]When working, the original monitoring information acquisition part sends the original monitoring information to the early warning target analysis and recognition part in real time, and the early warning target analysis and recognition part analyzes the received original monitoring information, identifies the type of early warning signal, and then sends a linkage command to the multi-channel signal receiving unit, and the linkage Instructions include linkage device ID, early warning target type, early warning target location, and early warning targe...
Embodiment 2
[0038] This embodiment discloses a scheduling method for the cooperative work of a video surveillance equipment cluster, which ensures that the video surveillance equipment can work reliably when unattended, and ensures the stability and reliability of system operation and the accuracy of tracking. Specifically, it includes the following steps:
[0039] S01), the original monitoring information collection component sends the original monitoring information to the early warning target analysis and identification component in real time;
[0040] S02), the early warning target analysis and identification component analyzes the received original monitoring information, identifies the type of early warning signal, and then sends a linkage command to the multi-channel signal transceiver unit, the linkage command includes linkage device ID, early warning target type, early warning target position, early warning target size;
[0041] S03), other monitoring equipment sends various sign...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com