Section limit calculation and shedding amount information obtaining method of power transmission section

A technology of transmission section and acquisition method, which is applied in the direction of electrical components, circuit devices, AC network circuits, etc., can solve the problems of not considering the operation of the stability control device, the inability to change and adjust the stability control measures, and increasing the transmission point, so as to avoid Insufficient cutting quantity, expanding control margin, and increasing the effect of error prevention function

Active Publication Date: 2019-06-04
POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This method requires manual calculations for each transmission section, and the relevant cut-off units or loads need to manually increase the transmission point, which is a large workload
At the same time, this method also does not consider the operation of the stability control device, and cannot be adjusted according to changes in the stability control measures.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Section limit calculation and shedding amount information obtaining method of power transmission section
  • Section limit calculation and shedding amount information obtaining method of power transmission section
  • Section limit calculation and shedding amount information obtaining method of power transmission section

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0050] A section limit calculation and slicable information acquisition method of a power transmission section, the schematic flow chart of which is shown in figure 1 Shown: Include the following steps:

[0051] S1. Dynamic detection of effective power system stability control measures;

[0052] S2. Judging whether the power system stability control measure condition is satisfied, if so, proceed to step S3, otherwise end the operation;

[0053] S3. Dynamic detection of effective cuttable components;

[0054] S4. Judging whether the condition of the cutable element is satisfied, if so, proceed to step S5, otherwise end the operation;

[0055] S5. Calculate the sensitivity of the cuttable element to the section;

[0056] S6. Judging whether the sensitivity of the cuttable element to the section is greater than the threshold value, if so, proceed to step S7, otherwise end the operation;

[0057] S7. Select key cuttable components;

[0058] S8. Detect the electrical quantity...

Embodiment 2

[0090] This example figure 2 Shown: There are three circuits of 500kV AC lines L1, L2, and L3 between area 1 and area 2, of which L1 and L2 are double-circuit lines on the same pole; in order to control the simultaneous tripping of L1 and L2, the power flow of L3 exceeds the overload limit after the accident , The risk of chain tripping occurs, {L1, L2, L3} constitutes the N-2 transmission section between area 1 and area 2, and the limit of the section is 3300MW.

[0091] Area 1 is equipped with stability control device A1, open line N-2 to switch unit function, the unit can be switched to G1, G2, G3, specifically: detect L1, L2, if the prior power sum of L1, L2 is greater than the threshold value Pmk, L1, When L2 trips, the stability control device calculates the cutting amount according to the relevant fixed value, and the action cuts off the G1, G2, and G3 units.

[0092] Area 2 is equipped with stabilizing device A2, and the function of line overload load shedding is ena...

Embodiment 3

[0116] If the stability control device does not collect the real-time electrical quantity of the cut-off unit or load or the real-time electrical quantity is wrongly uploaded, the following solutions can be adopted:

[0117] Read the SCADA value of the severable unit or load, compare and check with the estimated value of the state, and calculate the severable amount according to the following rules:

[0118] 1. The deviation between the severable SCADA value and the estimated state value is less than 2%, and the SCADA value is used as the real-time power flow of the severable unit or load to calculate the dynamic limit of the transmission section;

[0119]2. The deviation between the severable SCADA value and the estimated state value is between 2% and 5%. Take the SCADA value as the real-time power flow of the severable unit or load, calculate the dynamic limit of the transmission section, and issue an alarm message;

[0120] 3. If the deviation between the SCADA value of the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a section limit calculation and shedding amount information obtaining method of a power transmission section. A shedding unit or load related to the power transmission sectionis dynamically selected, and the consistency of a section considered stability control measure and a stability control measure of actual running is ensured. The shedding amount of the shedding unit or load is dynamically obtained, the accuracy of section limit calculation is ensured, the control margin is expanded, at the same time, the insufficient shedding amount is avoided, an anti-misoperation function is added, and the real-time and accurate shedding amount information is ensured.

Description

technical field [0001] The invention relates to the technical field of power system operation control, in particular to a section limit calculation and severable information acquisition method of a power transmission section. Background technique [0002] At present, the calculation of the transmission section limit generally follows the N-1 principle, that is, a single line of the power system, the main transformer fails, the system maintains stable operation, and other equipment does not exceed the accident overload capacity, and chain trips do not occur. In the actual power system production and operation, there are similar control requirements for double-circuit or multi-circuit lines paralleled on the same pole, and any busbar failure, which is generally called the N-2 principle. For such faults, stable control measures such as power shedding and load shedding are allowed. Therefore, the limit of the transmission section is not only related to the relevant lines and equ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/00
Inventor 陈睿杨文佳陈兴华吴国炳陈锦昌徐春华李新超郑丹
Owner POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD