Cement mixing pile wall foundation pit reinforcing construction method

A technology for cement mixing piles and foundation pits, which is applied in foundation structure engineering, excavation, construction, etc. It can solve the problems of cracked pile body, cement mixing pile body disturbance, fracture, etc., so as to reduce the generation of internal cracks and reduce secondary damage , Reduce the effect of shaking and vibration

Active Publication Date: 2019-07-09
GUANGZHOU XIEAN CONSTR ENG
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In the reinforcement process, if the post-tensioning anchor cable is directly implemented for anchor reinforcement, it is easy to disturb the cement mixing pile body, resulting in large displacement of the pile wall and cracks or pile body fracture due to the imposition of reverse tension.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cement mixing pile wall foundation pit reinforcing construction method
  • Cement mixing pile wall foundation pit reinforcing construction method
  • Cement mixing pile wall foundation pit reinforcing construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0042] The following specific embodiments are only explanations of the present invention, and they are not limitations of the present invention. Those skilled in the art can make modifications without creative contribution to the present embodiment as required after reading this specification, but as long as the rights of the following invention All claims are protected by patent law.

[0043] Cement mixing pile wall foundation pit reinforcement construction method, such as figure 1 and figure 2 shown, including the following steps:

[0044] Step 1: Set out the line on the pile top of the cement mixing pile body 1, and determine the drilling point;

[0045] After the occurrence of danger in foundation pit 8, strengthen the monitoring times of foundation pit 8, and use effective backfill materials to backfill backpressure according to the actual situation ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

According to the technical scheme, the cement mixing pile wall foundation pit reinforcing construction method is characterized by comprising the following steps that firstly, a line is paid off at thepile top of a cement mixing pile body, and a drilling point is determined; 2, a drilling machine is erected, and drilling is conducted on the cement mixing pile; step 3, inserting profile steel intothe drilled hole; 4, backfilling and grouting; step 5, manufacturing a coping beam steel bar template and pouring concrete; 6, positioning and drilling a pre-stressed anchor cable hole; step 7, inserting an anchor cable and grouting; step 8, tensioning the anchor cable; the post-positioned profile steel is drilled in the original cement mixing pile; the strength of the cement mixing pile is enhanced, then the tensioning anchor cable is used for tensioning anchor reinforcement, the situation that after direct implementation, the tensioning anchor cable is used for tensioning anchor reinforcement, disturbance is likely to be generated on a cement mixing pile body, a pile wall generates large displacement, and cracks or pile body breakage is generated due to the fact that reverse pulling force is forcedly applied is reduced, and the supporting effect of the supporting structure is improved.

Description

technical field [0001] The invention relates to the field of foundation pit reinforcement, more specifically, it relates to a cement mixing pile wall foundation pit reinforcement construction method. Background technique [0002] In the early stage of building construction foundation and foundation engineering construction, foundation pit support is a time-sensitive and risky project. Due to the limitations of geological exploration, the complexity of construction operations and the unpredictability of natural environments such as weather, There are often unstable factors in the foundation pit support construction process, which leads to the loss of the original support capacity of the foundation pit support structure, which greatly reduces the safety of the construction process and delays the construction period. [0003] As the most unpredictable factor among the influencing factors of construction work, the construction environment brings great instability to the quality ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D17/04
CPCE02D17/04E02D2300/0023E02D2600/30
Inventor 黄树其杜正鹏文勉聪林正秀
Owner GUANGZHOU XIEAN CONSTR ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products