A construction method and technology for subway stations, applied in excavation, infrastructure engineering, construction, etc., can solve problems such as insufficient stability of marking lines, unclear dividing lines, interference of drawn lines, etc., and achieve long marking duration and accurate marking , The effect of easy construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] Embodiment 1, a construction method for occlusal retaining piles of a subway station, comprises the following steps:
[0039] The first step is to draw the line.
[0040] In this embodiment, the marking operation steps are: clear the site on the surface of the pre-excavated foundation pit, plan the excavation location of the foundation pit on the site, and the location where the surrounding protection piles need to be constructed, and draw a line on the predetermined position, There are connecting columns 6 fixed at the four apexes of the foundation pit, and thin lines 7 are tied on the connecting columns 6, so that the thin lines 7 bypass the four connecting columns 6 in turn to form four dividing lines suspended on the ground. The interior is where the retaining piles are dug.
[0041] The connecting post 6 includes a fixed nail 60 inserted on the ground, and a wire winding post 61 fixed on the fixed nail 60 away from the ground. The winding rod 611 on the plate 610...
Embodiment 2
[0058] Embodiment 2, the difference between this embodiment and Embodiment 1 is: in the first step, the operation of marking is to draw a dividing line on the soft ground with objects such as pens or steel bars or branches on the ground. In the embodiment, practical steel bars are used to draw lines on the ground.
Embodiment 3
[0059] Embodiment 3, the difference between this embodiment and embodiment 1 is:
[0060] In the second step, the first body 1 is fixedly connected to the second body 2, and the first body 1 is fixedly connected to the third body 3. During installation, the first body 1 and the second body 2 are fixed to each other and placed in the guide wall groove Inside.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com