Confined water stratum foundation pit bottom soil layer pile foundation reinforcing pile distance and pile length prediction method
A technology of foundation pit bottom and prediction method, which is applied in the field of infrastructure construction, can solve problems such as lack of theoretical basis, and achieve the effect of strong process, convenient implementation and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0018] In order to make the above-mentioned features and advantages of the present invention more comprehensible, the following specific embodiments are described in detail as follows, but the present invention is not limited thereto.
[0019] A method for predicting the pile distance and pile length of pile foundation reinforcement in the soil layer at the bottom of foundation pit in confined water stratum, comprising the following steps:
[0020] (1) Determine the stratum distribution in the site: carry out geological drilling in the site to reveal the stratum distribution in the site. The thickness of the soil layer is , ;
[0021] (2) Determine the pressure of the confined water , according to the geological drilling results, determine the buried depth of the impermeable floor , The distance between the stable head of the confined water and the bottom of the impermeable layer ,and then ,in, For the weight of water, take 10kN / m 3 ;
[0022] (3) Determine th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com