Unlock instant, AI-driven research and patent intelligence for your innovation.

Constructor behavior analysis method based on UWB positioning

A technology of construction personnel and behavior analysis, applied in the direction of location information-based services, etc., can solve the problems of video surveillance monitoring blind spots, ineffective monitoring, and delay in rescue time, so as to standardize construction operations, improve construction efficiency, and reduce safety The effect of the accident

Active Publication Date: 2019-08-09
ELECTRICITY AFFAIR ENG COMPANY OF CHINA RAILWAY NO 8 ENG GRP +1
View PDF7 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in the construction site management process, it is not only necessary to manage the entry and exit of construction personnel, but also to standardize the construction operations of construction personnel. Because video surveillance is prone to monitoring blind spots and requires personnel to monitor for a long time, especially when alone in a certain location When construction workers encounter emergencies, they fail to detect and deal with them in time, which leads to delays in rescue time. Moreover, if construction workers slack in their work, they usually avoid video surveillance and cannot effectively monitor
Therefore, there are certain limitations in using existing supervision schemes such as video surveillance and broadcast notifications to carry out construction specification management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Constructor behavior analysis method based on UWB positioning
  • Constructor behavior analysis method based on UWB positioning

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] The present invention will be further described in detail below in conjunction with test examples and specific embodiments. However, it should not be understood that the scope of the above subject matter of the present invention is limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0018] like figure 1 and 2 As shown, the present invention is based on the construction personnel behavior analysis method of UWB positioning, and this method is specifically:

[0019] First, locate the UWB positioning tag on the helmet worn by each construction worker in the field to calculate the three-dimensional space position coordinates of each construction worker in the field in real time. Specifically, construction personnel need to wear safety helmets when entering the construction area. A certain number of positioning base stations set up on the site locate the UWB posit...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a constructor behavior analysis method based on UWB positioning, and the method comprises the steps: carrying out the positioning of a UWB positioning label on a safety helmetworn by each constructor in a field, and obtaining the three-dimensional space position coordinates of each constructor in the field in real time; then, by calculating the position change amplitude ofeach constructor in the specified construction plane in the current time window, identifying whether the constructor is slack in work or not; by calculating the height value of the position where each constructor is located in the field, identifying whether the constructor breaks the rule to climb or not; and judging whether the construction personnel without permission enter the virtual electronic fence area configured in the field, and identifying whether the construction personnel violate the rule to enter the field or not. Therefore, the construction operation of constructors can be effectively standardized, the construction efficiency is improved, and the occurrence of safety accidents is reduced.

Description

technical field [0001] The invention relates to the technical field of construction site safety management, in particular to a construction personnel behavior analysis method based on UWB positioning. Background technique [0002] At present, intelligent software and hardware tools such as video surveillance, broadcasting system, and gate entry and exit system have been widely used in construction site management. Moreover, there are already construction sites based on face recognition technology that realize the real-name system entry and exit management of the construction site. However, in the construction site management process, it is not only necessary to manage the entry and exit of construction personnel, but also to standardize the construction operations of construction personnel. Because video surveillance is prone to monitoring blind spots and requires personnel to monitor for a long time, especially when alone in a certain location When construction workers enco...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H04W4/021
CPCH04W4/021
Inventor 张志强胡基冬章扬枉璐白林沈弓召宋斌晏贵章朱建勇韩冰但峰张维陈晶
Owner ELECTRICITY AFFAIR ENG COMPANY OF CHINA RAILWAY NO 8 ENG GRP