Unlock instant, AI-driven research and patent intelligence for your innovation.

A method for analyzing the behavior of construction workers based on uwb positioning

A technology for construction personnel and behavior analysis, applied to services based on location information, etc., can solve problems such as ineffective monitoring, dead spots in video surveillance, delay in rescue time, etc., to improve construction efficiency, standardize construction operations, and reduce safety The effect of the accident

Active Publication Date: 2021-01-26
ELECTRICITY AFFAIR ENG COMPANY OF CHINA RAILWAY NO 8 ENG GRP +1
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in the construction site management process, it is not only necessary to manage the entry and exit of construction personnel, but also to standardize the construction operations of construction personnel. Because video surveillance is prone to monitoring blind spots and requires personnel to monitor for a long time, especially when alone in a certain location When construction workers encounter emergencies, they fail to detect and deal with them in time, which leads to delays in rescue time. Moreover, if construction workers slack in their work, they usually avoid video surveillance and cannot effectively monitor
Therefore, there are certain limitations in using existing supervision schemes such as video surveillance and broadcast notifications to carry out construction specification management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method for analyzing the behavior of construction workers based on uwb positioning
  • A method for analyzing the behavior of construction workers based on uwb positioning

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] The present invention will be further described in detail below in conjunction with test examples and specific embodiments. However, it should not be understood that the scope of the above subject matter of the present invention is limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0017] Such as figure 1 and 2 As shown, the present invention is based on the construction personnel behavior analysis method of UWB positioning, and this method is specifically:

[0018] First, locate the UWB positioning tag on the helmet worn by each construction worker in the field to calculate the three-dimensional space position coordinates of each construction worker in the field in real time. Specifically, construction personnel need to wear safety helmets when entering the construction area. A certain number of positioning base stations set up on the site locate the UWB po...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for analyzing the behavior of construction personnel based on UWB positioning. The method obtains the three-dimensional spatial position of each construction personnel in the field in real time by positioning the UWB positioning tags on the helmets worn by each construction personnel in the field. coordinates; then, by calculating the position change range of each construction worker in the specified construction plane within the current time window, identify whether the construction worker is slow; by calculating the height value of each construction worker's position in the field, identify whether the construction worker is in violation climbing; and judging whether there are unauthorized construction personnel entering the virtual electronic fence area configured on the site, and identifying whether construction personnel have entered in violation of regulations. Therefore, the present invention can effectively regulate the construction operations of construction personnel, improve construction efficiency and reduce the occurrence of safety accidents.

Description

technical field [0001] The invention relates to the technical field of construction site safety management, in particular to a construction personnel behavior analysis method based on UWB positioning. Background technique [0002] At present, intelligent software and hardware tools such as video surveillance, broadcasting system, and gate entry and exit system have been widely used in construction site management. Moreover, there are already construction sites based on face recognition technology that realize the real-name system entry and exit management of the construction site. However, in the construction site management process, it is not only necessary to manage the entry and exit of construction personnel, but also to standardize the construction operations of construction personnel. Because video surveillance is prone to monitoring blind spots and requires personnel to monitor for a long time, especially when alone in a certain location When construction workers enco...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H04W4/021
CPCH04W4/021
Inventor 张志强胡基冬章扬枉璐白林沈弓召宋斌晏贵章朱建勇韩冰但峰张维陈晶
Owner ELECTRICITY AFFAIR ENG COMPANY OF CHINA RAILWAY NO 8 ENG GRP