Temperature control and cracking preventing method for construction period of flood discharging tunnel lining concrete
A temperature-controlled anti-cracking and concrete technology, which is applied in water conservancy projects, marine engineering, infrastructure engineering, etc., can solve the problems of concrete cracking, unscientific, and temperature cracking in the lining of spillway tunnels
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
[0026] Due to the different functions of the spillway tunnel and the concrete dam, the structures, construction materials, construction techniques, and engineering quality requirements of the two are also completely different. Scientific and unreasonable.
[0027] The spillway tunnel is a thin-walled structure, which is very constrained by the surrounding bedrock. In order to make it meet the design strength requirements, the side walls of the spillway tunnel are usually made of high-grade, impact-resistant and wear-resistant concrete. This type of concrete has a large amount of cement and heat insulation It also has the typical characteristics of fast temperature rise and fast temperature drop.
[0028] In view of the structural characteristics of the spillway tunnel and the characteristics of construction materials, the temperature...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


