Deep and narrow foundation pit excavating construction draining method
A technology for deep and narrow foundations and foundation pits, which is used in infrastructure engineering, construction, etc., can solve problems such as inability of construction equipment to enter the site, low drainage efficiency, and impact on construction progress, so as to achieve efficient and high-quality drainage operations and ensure orderly progress. , the effect of improving drainage efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Such as Figure 1-6 Among them, a deep and narrow foundation pit excavation construction drainage method, through the multi-stage pumping station and intercepting ditch, the drainage operation in the deep and narrow foundation pit excavation construction is carried out in two stages: initial drainage and regular drainage.
[0040] In a preferred scheme, the initial drainage stage specifically includes the following steps:
[0041] 1) After the upstream cofferdam 1 of the foundation pit 7 of the dam, the anti-seepage wall of the downstream cofferdam 2 and the curtain grouting of the river bed section are completed, a first-stage upstream pump is installed on the upstream of the foundation pit 7 close to the upstream cofferdam 1 Station 3, a first-level downstream pumping station 4 is set on the downstream of the foundation pit 7 and close to the downstream cofferdam 2;
[0042] 2) Start the first-level upstream pumping station 3 and the first-level downstream pumping st...
Embodiment 2
[0050] Such as Figure 4 , 5 Among them, on the basis of Example 1, the surface seepage water intercepted by the upstream intercepting ditch 13 and the downstream intercepting ditch 13' flows into the first upstream sump 9 and the first downstream sump 11 by itself, and passes through A pumping station associated with the first upstream sump 9 and the first downstream sump 11 discharges water from the upstream cofferdam 1 and the downstream cofferdam 2 .
Embodiment 3
[0052] Such as Figure 4 , 5 Among them, on the basis of Example 1, an upstream dewatering well 10 and a downstream dewatering well 12 are respectively arranged on the upper and lower gravel backfill areas of the foundation pit 7, and the accumulated water in the upstream dewatering well 10 and the downstream dewatering well 12 is discharged to In the first upstream sump 9 and in the first downstream sump 11 .
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com