[0022] A method for constructing an equipment knowledge base of a power plant, comprising the following steps: 1) First, integrating the equipment asset data of the power plant side into a group database, and then obtaining the equipment asset data through an interface program; 2) Using the original operating parameters of the power generating equipment to calculate in real time 3) According to the experience of on-site professionals, the indicators and parameters are formed into criteria, and organized into a format in the system for implementation; 4) The equipment alarm, fault information, The cause of the failure and the treatment measures are combined with the criteria to store in the form of rules to form a rule base.
[0023] The step 1) first establishes an equipment asset database on the group side, and the equipment asset data includes power plant asset data, unit asset data, system asset data, equipment asset data, and component asset data.
[0024] The step 1) asse...
Embodiment 2
[0030] The format formed in step 3 is:
[0031]
[0032] Through this format, implementers can perform batch import operations in the system implementation interface, which is convenient for reducing the workload of implementers.
[0033] In step 4, the equipment alarm, fault information, fault cause and treatment measures are combined with criteria to store in the form of rules to form a rule base. The rule base is equipped with a rule trigger engine through the human-computer interaction page to realize real-time modification and calculation of rules.
[0034] The present invention firstly integrates the equipment asset data on the power plant side to the group side, then uses various indicators in the equipment operation of the power plant to form criteria based on experience, and then integrates the indicator criteria, equipment alarms, and failures of the equipment in the power plant Information, fault causes and handling measures are stored in the form of rules to for...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com