Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

5G base station signal tower

A technology of signal towers and base stations, applied in the field of signal towers, can solve the problems of increasing installation time for observation and test data machines, reducing work efficiency, and inconvenience of installing observation and test data machines, so as to improve convenience and stability, improve convenience, The effect of simple structure

Active Publication Date: 2019-09-13
长城鑫瑞鑫通讯设备集团有限公司
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Existing signal base stations require a large amount of manpower to install the machine for observing and testing data, which is extremely inconvenient for installing the machine for observing and testing data, increases the time for installing the machine for observing and testing data, and reduces work efficiency. It is necessary to install fixed 5G base station signal towers to solve the above problems

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • 5G base station signal tower
  • 5G base station signal tower
  • 5G base station signal tower

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] When quick installation is required, move the fixed installation frame body 8 to the front side of the support column 7, and make the support column 7 and the insertion through groove 85 in a relative position, then move the fixed installation frame body 8, so that the support column 7 is completely Insert it in the through groove 85, at this moment, make the locking groove 71 and the second chute 86 be in the relative position, then control the second pulley 833 and the third rotating shaft 841 to rotate by the second motor 842, at this moment, by the second The transmission belt 834 on the pulley 833 drives the first pulley 832 and the second rotating shaft 831 to rotate, and then the adjusting screw 828 on the left side is driven by the second rotating shaft 831 and the adjusting screw 828 on the right side is driven by the third rotating shaft 841 to rotate simultaneously. And the adjusting screw 828 drives the first sliding block 821 to slide toward the top directio...

Embodiment 2

[0030] When the test angle needs to be automatically adjusted, the first motor 826 controls the second bevel gear 825 to rotate positively and negatively, and then the second bevel gear 825 drives the first bevel gear 824, the first rotating shaft 823 and the first gear 827 to rotate positively and negatively. At this time, the first gear 827 drives the third gear 912, the sixth rotating shaft 911 and the fourth gear 913 to rotate positively and negatively, and then the fourth gear 913 drives the second gear 915, the fifth rotating shaft 914 and the fourth bevel gear 916 positively and negatively At the same time, the fourth bevel gear 916 drives the third bevel gear 923, the fourth rotating shaft 921 and the worm 922 to rotate positively and negatively, and finally the worm 922 drives the worm gear 925 and the mounting frame 926 on the worm gear 925 to rotate, thereby realizing left and right sides The mounting frame 926 performs the synchronous angle adjustment work.

[0031...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a 5G base station signal tower which comprises a tower body, a fixed mounting frame body and adjusting frame bodies fixedly arranged on the left side and right side of the fixed mounting frame body by bolts. The tower body is fixedly provided with a supporting column, first grooves are symmetrically formed in the left side end face and right side end face of the fixed mounting frame body, and a first sliding groove is formed between the first groove on the left side and the first groove on the right side in a communicating mode. A first sliding block is slidably connected to the first sliding groove in a matching mode, a first cavity is formed in the first sliding block, the first sliding block is further internally and rotatably connected with a first rotating shaft penetrating through the first cavity, first gears in the first groove located on the left side and the first groove located on the right side are fixedly arranged at the extending tail ends of the left side and right side of the first rotating shaft correspondingly, the first cavity is internally provided with a first bevel gear fixedly connected to the first rotating shaft circumferentially ina matching mode, and a first motor is fixedly arranged to the inner part of the bottom wall of the first cavity.

Description

technical field [0001] The invention relates to the technical field of signal towers, in particular to a 5G base station signal tower. Background technique [0002] The signal base station, that is, the public mobile communication base station, is a form of radio station, which refers to a radio transceiver station that transmits information between mobile phone terminals through a mobile communication switching center in a certain radio coverage area. Existing signal base stations require a large amount of manpower to install the machine for observing and testing data, which is extremely inconvenient for installing the machine for observing and testing data, increases the time for installing the machine for observing and testing data, and reduces work efficiency. It is necessary to install fixed 5G base station signal towers to solve the above problems. Contents of the invention [0003] The purpose of the present invention is to provide a 5G base station signal tower fo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04H12/00H04Q1/04
CPCE04H12/00H04Q1/04
Inventor 宋鹏威
Owner 长城鑫瑞鑫通讯设备集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products