Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method for seepage anticipation and treatment of underground continuous wall

A technique for underground diaphragm walls and construction methods, applied in sheet pile walls, foundation structure engineering, and by detecting the appearance of fluid at leak points, it can solve problems such as water seepage safety risks, achieve early treatment, and reduce the probability of water seepage occurrence , Avoid the effect of gushing water and sand

Active Publication Date: 2019-09-20
CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF4 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to overcome the defects of the prior art, to provide a construction method for the prediction and treatment of the leakage of the underground diaphragm wall, and to solve the problem of the underground diaphragm wall not being excavated before the excavation of the foundation pit in the existing underground diaphragm wall construction. The waterproof performance is tested, but there are still hidden dangers of water seepage and safety risks during the excavation of the foundation pit

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for seepage anticipation and treatment of underground continuous wall
  • Construction method for seepage anticipation and treatment of underground continuous wall
  • Construction method for seepage anticipation and treatment of underground continuous wall

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0039] refer to figure 1 , the present invention provides a construction method for the prediction and treatment of underground diaphragm wall leakage, which is used to detect whether there is leakage in the underground diaphragm wall in advance, and take timely measures when there is water seepage, so as to avoid water gushing and sand gushing in foundation pit excavation risk. By analyzing the structural form of the underground diaphragm wall, the geological conditions and the influence of surrounding buildings, the present invention determines in advance the position where sonar detection is most needed, and reduces the detection cost; the pre-embedded detection tube is simple and convenient, and the quality is highly controllable; Detect groundwater flow conditions, and the test results are highly reliable; for locations where the seepage ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method for seepage anticipation and treatment of an underground continuous wall. The construction method includes the following steps that according to the construction condition of the underground continuous wall, a seepage detection point is selected; during construction of underground continuous wall, a detection pipe is buried at the selected seepage detection point; after the construction of the underground continuous wall is finished, a detection probe of a sonar measuring instrument is sent into the detection pipe for detecting, and a detection result is obtained; and grouting water stop treatment is conducted on the leakage detection point which the seepage coefficient is larger than the set range in the detection result. According to the construction method, whether the underground continuous wall has seepage hidden danger or not is detected in advance to ensure safety of foundation pit excavation, if yes, grouting water stop treatment is conducted timely, the risk of water and sand gushing during foundation pit excavation is avoided, probability of seepage of the underground continuous wall is decreased, and construction safety of a foundation pit is improved.

Description

technical field [0001] The invention relates to the field of foundation pit construction engineering, in particular to a construction method for predicting and treating leakage of an underground continuous wall. Background technique [0002] The underground diaphragm wall has the characteristics of high structural rigidity, integrity, impermeability and durability, and can be used as a permanent earth and water retaining and load-bearing structure; it can adapt to various complex construction environments and hydrogeological adjustments, and can There is basically no noise and no vibration during the construction of existing buildings, and the impact on adjacent buildings and underground pipelines is small; underground walls of various depths, widths and shapes can be built. Because the underground diaphragm wall has a series of advantages, it is widely used in urban subway and deep foundation pit engineering. [0003] The waterproof performance of the underground diaphragm...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D31/04E02D15/04E02D5/18G01M3/24
CPCE02D5/187E02D15/04E02D31/04G01M3/24
Inventor 梁亚华杨永华赵维余云龙
Owner CHINA CONSTR EIGHT ENG DIV CORP LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products