Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A post-grouting reinforced cfg pile preparation method for anti-breaking pile head

A post-grouting and pile head technology, which is applied in the direction of sheet pile walls, buildings, foundation structure engineering, etc., can solve the problems that CFG piles cannot be guaranteed not to break shallow piles, cannot withstand excessive shear stress, and construction delays , to achieve the effect of easy construction operation, easy construction, and less cost increase

Active Publication Date: 2021-06-01
CHINA BUILDING TECHNOLOGY DEVELOPMENT CORP
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in some areas, the soil quality at the top of the pile is relatively soft and poor, and the 500mm protective soil layer cannot guarantee that the CFG pile will not break the shallow pile. The main reason is that the CFG pile is a plain concrete pile, and the plain concrete can withstand large compressive stress. , but it cannot withstand excessive shear stress. When the soil layer is too weak, the shear stress is too concentrated on the concrete at the shallow part of the CFG pile head, resulting in broken piles.
Previous experience is that either increasing the thickness of the protective layer or adding piles after the fact will cause a substantial increase in cost and delay in the construction period

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A post-grouting reinforced cfg pile preparation method for anti-breaking pile head
  • A post-grouting reinforced cfg pile preparation method for anti-breaking pile head

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The following will be combined with Figure 1-2 , to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0027] Such as Figure 1-2 Shown, a kind of back grouting reinforced CFG pile preparation method of anti-breaking pile head is characterized in that, carries out according to the following steps:

[0028] Step 1: Drill holes with an auger drill;

[0029] Step 2: After drilling to the bottom of the hole and pouring concrete to the top of the pile, the concrete shaft (3) is formed, and the first steel bar (6) is inserted into the top of the pile by 0.5m-1m to form a pre-CFG pile;

[0030] Step 3: Insert a post-inserted steel pipe (2) with a grouting head from the center of the pre-CFG pile to the pile end, and extend the steel strand (5) from the rear end of the post-inserted steel pipe (2)...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the field of piling, and in particular relates to a method for preparing a post-grouting reinforced CFG pile for preventing pile heads, which is characterized in that it is carried out in accordance with the following steps: Step 1, drilling with an auger; Step 2, drilling to the hole After pouring concrete to the top of the pile, insert the first steel bar (6) into the top of the pile by 0.5m-1m to form a pre-CFG pile; Step 3, use a post-inserted steel pipe (2) with a grouting head from the pre-CFG The center of the CFG pile top is inserted to the pile end, and the steel strand (5) is extended from the rear end of the rear insertion steel pipe (2) to the front end of the rear insertion steel pipe (2); step 4, after the pre-CFG pile is formed for 24h‑48h, Step by step grouting in the steel pipe (2) through the grouting head pair, reinforce the pile end; step five, trim the length of the first steel bar (6) and the steel strand (5) exposed above the top of the pile; The first steel bar (6) and the steel strand (5) above the roof are poured with sand and gravel filling; Step 7, setting and compacting roadbed stones above the sand and gravel filling. The pile end of the present invention is fastened, and the pile top is solid and not broken.

Description

technical field [0001] The invention belongs to the field of piling, and in particular relates to a method for preparing a post-grouting reinforced CFG pile of an anti-breaking pile head. Background technique [0002] In the prior art, when the pile tip is located in silt or silty clay, the bearing capacity and deformation cannot meet the requirements, or the bearing capacity meets the requirements, but the deformation cannot meet the requirements, and it is easy to penetrate into the damaged site. [0003] According to the requirements of the specification, when constructing CFG piles, a protective soil layer of 300mm-500mm is required above the top of the piles, and mechanical walking construction is carried out on the top of the piles, and it is ensured that the shallow parts of the tops of CFG piles will not be broken during excavation. However, in some areas, the soil quality at the top of the pile is relatively soft and poor, and the 500mm protective soil layer cannot ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D5/46
CPCE02D5/46
Inventor 毛宗原
Owner CHINA BUILDING TECHNOLOGY DEVELOPMENT CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products