A circular work and assembly technology, applied in excavation, artificial islands, water conservancy projects, etc., can solve problems such as long construction period, high cost, and difficulty in sinking, and achieve the effects of high environmental protection and cost-effectiveness, saving resource waste and shortening construction period.

Active Publication Date: 2021-05-04
南方工程检测修复技术研究院
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, regarding the design and construction of working wells, receiving wells and relay rooms, caisson well technology or inverted well technology is still the main choice. Although it is safe and reliable, it has high cost, long construction period, difficulty in sinking, inclination and improper operation. Instability accidents, etc., especially in working wells, one or more sides may need to bear the jacking reaction force during the pipe jacking construction process, and the establishment of the back wall is also a very complicated process

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A prefabricated recyclable circular working well with integrated rear leaning wall and its construction method
  • A prefabricated recyclable circular working well with integrated rear leaning wall and its construction method
  • A prefabricated recyclable circular working well with integrated rear leaning wall and its construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0048]A construction method for a prefabricated recyclable circular working well with an integrated rear wall. First, the functional requirements design of the circular pipe-jacking working well is completed; then the construction of support piles, the installation of prefabricated crown beams, and the construction of edge protection are carried out in sequence. ; Then carry out the earthwork excavation of the circular pipe jacking work well, the alternate construction of the soil retaining panel and the annular inner support beam; install the ladder and the bottom seal of the work well into the circular work well, and then carry out the back-to-wall construction to complete the assembly The integrated construction of the recyclable circular pipe jacking working well and the back wall; after the operation in the well is completed, the back wall, soil retaining panel, annular inner support beam, crown beam and support piles are gradually recovered during the backfill process Wel...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a design and construction method for the integration of an assembled recyclable circular pipe jacking well and a back-to-wall, including: (1) functional requirement design of a circular pipe jacking well; (2) construction of support piles (3) Installation of prefabricated crown beams; (4) Border protection construction; (5) Alternate construction of earthwork excavation, soil retaining panels, and circular inner support beams; (6) Installation of ladders for entering circular pipe jacking wells; ( 7) Sealing of the circular pipe jacking work well; (8) Back-to-wall construction can complete the integrated construction of the assembled recyclable circular pipe-jacking work well and the back wall; (9) After the operation in the well is completed, the backfilling process In the reverse order, the working well components such as the back wall, soil retaining panel, annular inner support beam, prefabricated crown beam and support pile are gradually recovered. The structural system constructed by the invention has many advantages such as clear function, safety and quickness, recyclable assembly type, reusability, etc., and provides a new method for trenchless construction of underground pipelines such as water conservancy, municipal administration, heat power, and communication.

Description

technical field [0001] The invention belongs to the field of non-excavation construction and restoration of infrastructure facilities such as water conservancy, municipal administration, heat power, and communication, and specifically relates to providing a back-to-wall integrated system for the non-excavation construction and restoration of underground pipelines such as water conservancy, municipal administration, heat power, and communication. A prefabricated recyclable circular working well and its construction method. Background technique [0002] The process of urbanization is accelerating, not only to build a large number of underground infrastructure facilities, but also to face the problem of a large number of old underground pipelines over the service period, which makes the underground pipeline network of many urban roads very complicated, and road surface collapse and safety accidents frequently occur due to damage to underground pipelines . With traffic requirem...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E02D29/12E02D17/08E06C1/36
CPCE02D17/08E02D17/083E02D29/12E02D29/125E06C1/36
Inventor 王复明潘艳辉方宏远赵鹏郭成超
Owner 南方工程检测修复技术研究院
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products