Pre-buried steel sleeve joint structure between prefabrication tube pile and prefabrication bearing platform

A technology for prefabricated caps and prefabricated pipe piles is applied in the field of joint structures of prefabricated steel sleeves between prefabricated pipe piles and prefabricated caps. Connection and other issues, to achieve the effect of high prefabrication rate, convenient construction, and enhanced connection integrity

Pending Publication Date: 2020-01-03
CHINA RAILWAY DESIGN GRP CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The current codes and atlases mostly use core-filled concrete cast-in-place schemes for the connection between prefabricated pipe piles and cast-in-place caps. Poor shear resistance, large amount of wet work on site, and not suitable for the connection between prefabricated pipe piles and prefabricated caps

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pre-buried steel sleeve joint structure between prefabrication tube pile and prefabrication bearing platform
  • Pre-buried steel sleeve joint structure between prefabrication tube pile and prefabrication bearing platform
  • Pre-buried steel sleeve joint structure between prefabrication tube pile and prefabrication bearing platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] Below in conjunction with accompanying drawing and specific embodiment the present invention is described in further detail:

[0026] Such as Figure 1 to Figure 6 As shown, the present invention is a connection structure between a prefabricated pipe pile and a prefabricated cap, including a prefabricated cap part A, a prefabricated pipe pile part B, a steel sleeve joint part C and a connecting part D; the prefabricated cap part A and the steel sleeve joint part C are a prefabricated cap assembly part with joints, and the connecting part D connects the prefabricated pipe pile part B and the prefabricated cap cap assembly part with joints as a whole.

[0027] Such as figure 1 , image 3 and Figure 5 As shown, the prefabricated platform component A includes the platform 1, the high-strength screw hole, the grouting channel 4, the exhaust channel 3 and the joint installation groove 2 are reserved on the platform; the diameter of the channel is 5 cm, and the steel sleev...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a pre-buried steel sleeve joint structure between a prefabrication tube pile and a prefabrication bearing platform, which includes a prefabrication bearing platform component A, a prefabrication tube pile component B, a steel sleeve joint component C and a connection part D, wherein the prefabrication bearing platform component A and the steel sleeve joint component C are integrally prefabricated into a bearing platform component with a joint; the connection part D is used for connecting the prefabrication tube pile component B with the bearing platform component prefabricated with the joint into a whole. The pre-buried steel sleeve joint structure has the following beneficial effects: joint integrity and reliability are improved through preserved connecting reinforcement and top injection, an inner sleeve and reinforcing ribs are arranged inside the joint structure to effectively improve the bending resistance and shear-bearing capacity of the joint position; the structure is safe and reliable, the construction is convenient and quick, and the prefabrication efficiency is high; the pre-buried steel sleeve joint structure between the prefabrication tube pileand the prefabrication bearing platform is clear and direct in force transmission, the welding quality is controllable, the connection integrity of the prefabrication tube pile and the prefabricationbearing platform is enhanced, the bending resistance and shear-bearing capacity of the joint position are improved, the factory machining and on-site construction are convenient and simple, and the quality is easily guaranteed.

Description

technical field [0001] The invention relates to a connection structure between a railway pipe pile and a cap; in particular, it relates to a joint structure of a prefabricated steel sleeve between a prefabricated pipe pile and a prefabricated cap. Background technique [0002] The current codes and atlases mostly use core-filled concrete cast-in-place schemes for the connection between prefabricated pipe piles and cast-in-place caps. The shear resistance is poor, the site has a large amount of wet work, and it is not suitable for the connection between the prefabricated pipe pile and the prefabricated cap. At present, the prefabricated structure has good development prospects due to its advantages of high industrialization efficiency, high production quality, convenient construction, and fast construction speed, and has been widely used all over the country. A connecting structure capable of reliably connecting prefabricated parts. Contents of the invention [0003] The ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D5/24E02D27/12E02D27/14E04C5/16
CPCE02D5/24E02D27/12E02D27/14E04C5/162
Inventor 闫世杰高修建吕宝伟李楠马鹏飞武继虎王凯杰宋智勇刘强林森斌齐旭东刘传名信磊磊
Owner CHINA RAILWAY DESIGN GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products