Synchronous pouring construction method of preset isolation layer for concrete structural column
A construction method and synchronous pouring technology, applied in the direction of building structures, columns, buildings, etc., can solve the problems of wasting steel bars, cumbersome planting bars, binding of steel cages, inconvenient vibration, etc., and achieve convenient construction and structural design Novelty, the effect of expanding the scope of use
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] In the embodiment of the present invention, the construction technical requirements such as steel pipe welding and cutting, steel cage binding, concrete pouring, etc. will not be repeated, and the embodiment of the present invention will be emphasized. The present invention will be further described in detail below in conjunction with the accompanying drawings and examples. Not limited to the following examples.
[0029] figure 1 It is a schematic diagram of the simultaneous pouring of the preset isolation layer of the concrete structural column; figure 2 It is a schematic diagram of the installation and construction of the pre-set isolation layer formwork system for concrete structural columns; image 3 is the schematic diagram of pilot tunnel plugging; Figure 4 It is a schematic plan view of the formwork system of the preset isolation layer of the concrete structural column; Figure 5 It is a schematic diagram of the installation of the rear-expanding feeding dev...
PUM