Industrial park comprehensive demand response scheduling method based on multi-energy cooperation

A technology for demand response and industrial parks, applied in data processing applications, AC network voltage adjustment, power network operating system integration, etc., can solve the problem that there is no research on IDR plan design and incentive compensation, no related research, and different types have not yet been involved Interaction of energy demand, generalized demand-side resource unified optimal scheduling, etc.

Inactive Publication Date: 2020-01-03
GUANGZHOU POWER SUPPLY CO LTD +1
View PDF2 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

It has not yet involved the interaction between different types of energy demands and the unified optimal scheduling of generalized demand-side resources
[0011] 2. At present, most studies believe that CCHP and flexible load are two independent methods to achieve optimal scheduling, that is, the former is not considered as a demand-side resource that can be used for IDR purposes. It is usually assumed that CCHP is owned by VPP or microgrid operators, and demand response Still an interaction between consumer and operator without the involvement of other actors
However, the interaction between the demand side of one energy system and the supply side of another energy system, for example, how changes in heat demand affect electricity supply, has not yet been studied
[0013] 4. The current research usually regards the user's flexible needs as a resource that can be directly controlled, and has not studied how to design and provide incentive compensation in the IDR plan

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Industrial park comprehensive demand response scheduling method based on multi-energy cooperation
  • Industrial park comprehensive demand response scheduling method based on multi-energy cooperation
  • Industrial park comprehensive demand response scheduling method based on multi-energy cooperation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0091] The following describes the preferred embodiments of the present invention with reference to the accompanying drawings to make the technical content clearer and easier to understand. The present invention can be embodied in many different forms of embodiments, and the protection scope of the present invention is not limited to the embodiments mentioned herein.

[0092] The invention discusses the interactive mode of multi-energy demand management, and proposes a comprehensive demand response mechanism and dispatching method for the comprehensive energy system of the industrial park, especially the demand response dispatching with various energy demands such as electricity, heat and cold. The mechanism utilizes three interaction modes to facilitate the interaction between supply and demand of multi-energy systems.

[0093] The comprehensive demand response scheduling method proposed by the present invention mainly includes the following aspects:

[0094]1. Design an IDR...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an industrial park comprehensive demand response scheduling method based on multi-energy cooperation. The method comprises steps that an operator executes day-ahead load prediction and reports the day-ahead load prediction to ISO or bids to the power market; the operator obtains a load reduction index from the ISO or the market clearing result; the operator determines a scheduling plan by solving a comprehensive demand response optimization model and informs a consumer and the CCHP of the result; if any consumer or CCHP cannot respond according to an instruction, the operator rearranges the scheduling plan, otherwise, the response is executed; on the second day, the consumer adjusts the load demand, reduces the power load or increases the heat and cold loads at theappointed time, and the CCHP correspondingly adjusts the yield to balance the load. The method is advantaged in that various interactive modes such as interruptible load, multi-energy demand coupling,multi-energy supply and demand interaction and the like are provided, the selectable space of a user is increased, scheduling means of the operator is increased, comprehensive energy consumption management is realized, and scheduling cost is reduced.

Description

technical field [0001] The invention relates to the technical field of comprehensive demand response scheduling, in particular to a multi-energy coordination-based comprehensive demand response scheduling method for industrial parks. Background technique [0002] Thanks to advances in smart grid technology and advanced metering facilities, the flexibility of consumers' electricity demand has increased significantly. Many Demand Response (DR) mechanisms have been studied to achieve the goals of peak shaving or renewable energy consumption. [0003] In recent years, the development of combined heat and power and integrated technology has promoted the evolution of demand response in smart grids to integrated demand response (Integrated Demand Response, IDR) in integrated energy systems (Integrated Energy System, IES). Like electricity demand, consumer energy demand can be flexible and adjustable if given the right incentives. Therefore, a reasonable IDR mechanism becomes an i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/00H02J3/14G06Q10/06G06Q50/06
CPCG06Q10/06315G06Q50/06H02J3/00H02J3/14Y02B70/3225Y02E40/70Y04S10/50Y04S20/222
Inventor 胡帆姜子卿廖建平艾芊熊文王莉曾顺奇李诗颖余志文
Owner GUANGZHOU POWER SUPPLY CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products