Unlock instant, AI-driven research and patent intelligence for your innovation.

Linkage pipe gallery operation and maintenance method

A pipe gallery and linkage technology, which is applied in the direction of program control and control/adjustment system in instruments, sequence/logic controllers, etc., can solve the problems of poor performance and low linkage execution, and achieve the effect of performance improvement

Inactive Publication Date: 2020-02-11
CRSC WANQUAN SIGNAL EQUIP
View PDF5 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The invention provides an operation and maintenance method for linkage pipe gallery, which aims to solve the problems of low linkage execution force and poor performance in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Linkage pipe gallery operation and maintenance method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0041] Such as figure 1 As shown, a method for the operation and maintenance of a linkage pipe gallery includes the following steps:

[0042] S100. Establish a custom linkage control center and edit the linkage rules on the pipe corridor operation and maintenance management platform, wherein the linkage rules include linkage description, equipment type that triggers linkage, point information, equipment point control threshold that triggers linkage, Threshold algorithm type;

[0043] S110. Synchronize the linkage configuration rules of the utility gallery operation and maintenance management platform in real time and dynamically configure the linkage control unit. The linkage control unit data includes linkage description, controlled device control unit code, device code of the controlled device control unit, and controlled device control unit. The point information and linkage enabling status of the control unit of the control device;

[0044] S120. When regularly uploading...

Embodiment 2

[0047] A linkage pipe gallery operation and maintenance system, characterized in that the system includes PLC data acquisition and linkage layer, pipe gallery operation and maintenance management platform, and sensing equipment, and the pipe gallery operation and maintenance management platform includes a pipe gallery monitoring and management subsystem . Pipe gallery operation and maintenance management subsystem. The pipe gallery monitoring and management subsystem includes a system overview module and a comprehensive monitoring module. The pipe gallery operation and maintenance management subsystem includes an emergency management module, an operation and maintenance management module, an operation management module, a construction Construction management module, BIM simulation module, administrative management module, wherein, the system overview module includes:

[0048] Collect equipment monitoring overview, pipe gallery operation and maintenance overview, and BIM environ...

Embodiment 3

[0058] A linkage pipe gallery operation and maintenance system, characterized in that the system includes PLC data acquisition and linkage layer, pipe gallery operation and maintenance management platform, and sensing equipment, and the pipe gallery operation and maintenance management platform includes a pipe gallery monitoring and management subsystem . Pipe gallery operation and maintenance management subsystem. The pipe gallery monitoring and management subsystem includes a system overview module and a comprehensive monitoring module. The pipe gallery operation and maintenance management subsystem includes an emergency management module, an operation and maintenance management module, an operation management module, a construction Construction management module, BIM simulation module, administrative management module, wherein, described emergency management module comprises:

[0059] The system configures emergency event types, processes, plans, personnel, and materials;

...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a linkage pipe gallery operation and maintenance method. The method comprises the following steps that a customized linkage control center is established, and linkage rules areedited on a pipe gallery operation and maintenance management platform; a linkage configuration rule of the pipe gallery operation and maintenance management platform is synchronized in real time, and the linkage control center is configured dynamically; and when equipment state data is uploaded to the linkage control center regularly and the leakage condition is determined to be satisfied, and the linkage control unit of equipment is downloaded, and related equipment control commands are executed successively to realize a linkage function. The method solves the problem that poor linkage execution and low performance in the prior art.

Description

technical field [0001] The invention relates to the field of pipe gallery operation and maintenance, in particular to a linkage pipe gallery operation and maintenance method. Background technique [0002] The comprehensive pipe gallery refers to a municipal project that builds a municipal shared tunnel under the urban road and combines power, communication, gas, heating, drainage and other pipelines. At present, there are problems such as low overall operation and maintenance level, high management cost, and low equipment operation efficiency in urban comprehensive utility corridors. Therefore, it is the task of each utility corridor operation and maintenance department to build a set of operation and maintenance systems that can operate efficiently in the utility corridor Target. [0003] In order to solve the need for improved pipeline operation and maintenance methods, various pipeline operation and maintenance companies continue to apply cutting-edge technologies to imp...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G05B19/05
CPCG05B19/054G05B2219/1138
Inventor 马恩邱阳孟君方益柯李帆陈伟
Owner CRSC WANQUAN SIGNAL EQUIP