Integrated line parameter insulation integrated testing device and method
A line parameter and test device technology, which is applied in the direction of measuring device, electric variable measurement, high resistance measurement, etc., can solve the problem of large risk factor of insulation resistance nuclear phase, unreduced risk of test equipment, and long test time of line parameters And other issues
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] Such as Figure 1-Figure 5 As shown, the present invention provides an integrated test device for integrated line parameter insulation, including:
[0046] Insulation measurement unit 1, the input end of insulation measurement unit 1 is connected with the three-phase line to be tested, and insulation measurement unit 1 includes phase selection module 11, function selection module 12, several function modules 13, phase selection module 11 and three-phase line to be tested connected, for selecting the three-phase line to be measured, the input end of the function selection module 12 is connected with the output end of the phase selection module 11, and is used for selecting several function modules 13, and the input ends of several function modules 13 are connected with the function selection module 12 output connections.
[0047] An isolated grounding protection unit 2, the isolated grounding protection unit 2 includes an isolation module 21 and a grounding protection m...
Embodiment 2
[0068] Such as Figure 6 As shown, the present invention also provides an integrated test method for integrated line parameter insulation, which is realized by the integrated test device for integrated line parameter insulation in Embodiment 1 of the present invention, including:
[0069] S1, sequentially closing the first switch group, the second switch group, and the third switch, opening the first switch group, and measuring the induced voltage of the phase line to be tested; and / or,
[0070] S2, sequentially closing the first switch group, the second switch group, and the fourth switch group, disconnecting the first switch group, and performing the insulation and phase verification test of the phase line to be tested; and / or,
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


