Ground anchor structure of cable-stayed buckling and hanging cable hoisting system and construction method
A cable hoisting and construction method technology, which is applied in infrastructure engineering, cable cranes, textile cables, etc., can solve the problems of large amount of concrete poured, low construction cost, inconvenient dismantling, etc. The effect of low construction cost and saving a lot of materials
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] This embodiment provides a ground anchor structure for a cable-stayed buckle-hanging cable hoisting system;
[0035] Such as Figure 1-Figure 4 As shown, the ground anchor structure of the cable-stayed buckle hanging cable hoisting system in this embodiment includes a lower ballast 4 and an upper ballast 1 arranged on the top of the lower ballast 4, and the upper ballast 1 includes several vertically stacked Each weight layer includes a fence 12 arranged around the weight layer and a soil 13 filled in the fence 12, and the fence 12 is piled up after the ecological bag 121 is filled with soil. As a result, a geogrid 11 is also provided on the edge of each weight layer, and the geogrid 11 wraps the enclosure 12 from the lower surface of the weight layer and then folds over the upper surface of the weight layer.
[0036] In the present invention, the enclosure is formed by stacking soil in ecological bags, and the enclosure is filled with soil to form a weight layer, and ...
Embodiment 2
[0043] This embodiment provides a construction method for the ground anchor structure of the cable-stayed buckle-hanging cable hoisting system;
[0044] A cable-stayed buckle hanging cable hoisting system ground anchor structure construction method, comprising the following steps:
[0045] A, laying geogrid 11;
[0046] B. After the ecological bag 121 is filled with soil, build an annular enclosure 12 in the inner area of the geogrid 11, and fill the enclosure 12 with soil 13 and then level and compact it to form a weight layer;
[0047] C. Fold the geogrid 11 located on the outer side of the enclosure 12 on the upper surface of the weight layer;
[0048] D. Repeat steps A-C until the upper pressure is capped at 1.
[0049]In this method, the geogrid is laid first, and the ecological bagged soil is built in the inner area of the geogrid to form a circular enclosure, and the soil is filled in the enclosure to be leveled and compacted to form a weight layer. The geogrid o...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com