Water-rich sandy cobble stratum shield proximate sensitive building elaborative control construction method
A technology of refined control and construction methods, applied in underground chambers, earthwork drilling, wellbore lining, etc., can solve the problems of large impact of sensitive buildings, construction disturbance, poor construction effect, etc., to solve the grouting series running Slurry, avoid the effect of strong disturbance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0049] Please refer to image 3 , during the construction of 60 shields in water-rich sand and pebble formations, the present invention provides a specific implementation as follows:
[0050] A 220kV power tunnel project has a total length of 5957.012m and is constructed by shield method. The inner diameter of the tunnel is 3.6m, the outer diameter is 4.1m, the minimum curve radius is 150m, and the maximum slope is 18‰. It is planned to have 4 circuits of 220kV cables and 8 circuits of 110kV cables. Among them, the section length of 2# shield machine-1# shield tunnel tunnel in the bid section is 3050m, and the section length of 2# shield tunnel-3# shield tunnel is 2841.8m, both of which are constructed by shield method. In this tunnel project, two shield machines are used to undertake the construction task of the interval tunnel. The tunneling direction of the two shield machines starts from the 2# shield shaft to the 1# and 3# shield shafts. The excavation diameter of the sh...