Water-rich sandy cobble stratum shield proximate sensitive building elaborative control construction method

A technology of refined control and construction methods, applied in underground chambers, earthwork drilling, wellbore lining, etc., can solve the problems of large impact of sensitive buildings, construction disturbance, poor construction effect, etc., to solve the grouting series running Slurry, avoid the effect of strong disturbance

Active Publication Date: 2020-03-27
CCFEB CIVIL ENG
View PDF8 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The fine control construction method of shield tunneling in water-rich sand and pebble stratum close to sensitive buildings provided by the present invention is to solve the construction disturbance in the construction process of existing shield tunneling in water-rich sand and pebble stratum close to sensitive buildings, which has a great impact on sensitive buildings. Technical problems with poor construction effect

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Water-rich sandy cobble stratum shield proximate sensitive building elaborative control construction method
  • Water-rich sandy cobble stratum shield proximate sensitive building elaborative control construction method
  • Water-rich sandy cobble stratum shield proximate sensitive building elaborative control construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment approach

[0049] Please refer to image 3 , during the construction of 60 shields in water-rich sand and pebble formations, the present invention provides a specific implementation as follows:

[0050] A 220kV power tunnel project has a total length of 5957.012m and is constructed by shield method. The inner diameter of the tunnel is 3.6m, the outer diameter is 4.1m, the minimum curve radius is 150m, and the maximum slope is 18‰. It is planned to have 4 circuits of 220kV cables and 8 circuits of 110kV cables. Among them, the section length of 2# shield machine-1# shield tunnel tunnel in the bid section is 3050m, and the section length of 2# shield tunnel-3# shield tunnel is 2841.8m, both of which are constructed by shield method. In this tunnel project, two shield machines are used to undertake the construction task of the interval tunnel. The tunneling direction of the two shield machines starts from the 2# shield shaft to the 1# and 3# shield shafts. The excavation diameter of the sh...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a water-rich sandy cobble stratum shield proximate sensitive building elaborative control construction method. The method includes the steps that S101, construction parametersof a shield machine are set so as to control the soil discharging amount, the pressure of a soil bin of the shield machine and the soil and water pressure of a tunneling face are equal so that the shield machine can be in soil and pressure balance state construction, the injection amount of a grouting body is calculated, the target injection amount of constant shield mud is calculated according toa shield clearance, and the target injection amount of cement slurry is calculated according to a tube clearance; and S102, in the tunneling process of the shield machine, the constant shield mud isinjected synchronously through radial holes in a front shield, the shield clearance is filled with the constant shield mud, the cement slurry is synchronously injected to the outer side of a tube piece ring disengaged out of a rear shield through a grouting hole in the rear shield, and the tube clearance is filled. By means of the water-rich sandy cobble stratum shield proximate sensitive buildingelaborative control construction method, ground surface settlement millimeter construction of water-rich sandy cobble stratum shield construction disturbance is achieved.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a finely controlled construction method of a shield approaching a sensitive building in a water-rich sandy pebble stratum. Background technique [0002] In recent years, with the rapid advancement of urbanization, basic transportation and facilities construction activities have developed rapidly. In the construction of urban rail transit and municipal utility corridors, shield tunnels are widely used because of their outstanding features. However, due to the complexity of the underground environment and ground conditions, a large number of shield tunneling engineering problems emerge in endlessly. Among them, the disturbance effect of shield tunneling construction on the ground surface and adjacent buildings is unavoidable. In the case of unstable control of shield tunneling construction in special strata, it is very easy to cause problems such as surface subsidenc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D9/087E21D11/10C04B28/02C04B111/70
CPCC04B28/02C04B2111/00724C04B2111/70E21D9/087E21D11/10E21D9/0873C04B18/08C04B14/104C04B14/06
Inventor 肖洪波杨果林陈亚军张沛然吕涛戴志浩龙彪
Owner CCFEB CIVIL ENG