Drainage asphalt pavement with replaceable transverse drainage hose

A drainage asphalt and horizontal drainage technology, which is applied to the cohesive pavement paved on site, roads, roads, etc., can solve the problems of horizontal drainage hose clogging and inability to clean, so as to prolong the patency life and facilitate the replacement process Quick and smooth drainage channels

Active Publication Date: 2020-04-14
SHANGHAI PUDONG ROAD & BRIDGE CONSTR
5 Cites 3 Cited by

AI-Extracted Technical Summary

Problems solved by technology

[0005] In order to solve the above technical problems, the present invention provides a drainage asphalt pavement with a replaceable horizontal drainage h...
View more

Method used

In embodiment one, as shown in Figure 1, present embodiment provides a kind of drainage property asphalt pavement that horizontal drainage hose can replace, comprises from top to bottom: large void permeable asphalt surface course 1, improved Bleeding seal layer 3 of emulsified asphalt, middle and lower layer of asphalt mixture 5, graded crushed stone seal layer 6, bonding layer and base layer 7, wherein the middle and lower layer of asphalt mixture 5 is provided with horizontal drainage groove 4, A multi-layer permeable drainage pipe group 2 is arranged in the horizontal drainage groove 4 . The drain pipe set 2 includes a helical spring metal permeable hose and a porous PVC drain pipe set, and the metal water permeable hose is sleeved on the outside of the PVC drain pipe set. The PVC drainage pipe group includes a plurality of PVC drainage pipes with different diameters. The PVC dr...
View more

Abstract

The invention relates to the technical field of pavement drainage, and discloses a drainage asphalt pavement with a replaceable transverse drainage hose. The drainage asphalt pavement comprises a large-gap permeable asphalt concrete surface layer, a modified emulsified asphalt bleeding sealing layer, an asphalt mixture middle-lower surface layer, a graded broken stone sealing layer, a bonding layer and a base layer from top to bottom, a transverse drainage cutting groove is formed in the asphalt mixture middle-lower surface layer, and a plurality of layers of permeable drainage pipe sets are arranged in the transverse drainage cutting groove. By optimizing the transverse drainage of the pavement and adopting the drainage pipe group capable of being replaced for multiple times, when the drainage pipe group is blocked, the function of the drainage pipe group can be restored to the beginning of traffic through replacement, the function maximization of the transverse drainage capacity of the pavement in the whole life cycle of the pavement is ensured, and the service life of the water seepage function of the whole drainage pavement is prolonged; and the drainage pipe group is convenient and quick to replace, low in laying cost and simple in process, and can meet the requirements of current elevated or ground drainage asphalt pavement newly-built projects.

Application Domain

In situ pavingsPaving gutters/kerbs

Technology Topic

Geotechnical engineeringWater seepage +7

Image

  • Drainage asphalt pavement with replaceable transverse drainage hose

Examples

  • Experimental program(1)

Example Embodiment

[0025] In the following description, for the purpose of illustration rather than limitation, specific details such as a specific system structure and technology are proposed for a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application can also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to avoid unnecessary details from obstructing the description of this application.
[0026] It should be understood that when used in this specification and the appended claims, the term "comprising" indicates the existence of the described features, wholes, steps, operations, elements and/or components, but does not exclude one or more other The existence or addition of features, wholes, steps, operations, elements, components, and/or collections.
[0027] In order to make the drawings concise, the drawings only schematically show the parts related to the present invention, and they do not represent the actual structure of the product. In addition, in order to make the drawings concise and easy to understand, in some drawings, only one of the components with the same structure or function is schematically shown, or only one of them is marked. In this article, "a" not only means "only this one", but can also mean "more than one".
[0028] It should be further understood that the term "and/or" used in the specification and appended claims of this application refers to any combination and all possible combinations of one or more of the associated listed items, and includes these combinations .
[0029] In the embodiment shown in the drawings, the direction indications (such as up, down, left, right, front and back) are used to explain the structure and movement of the various components of the present invention, not absolute but relative. These descriptions are appropriate when these components are in the positions shown in the drawings. If the description of the location of these components changes, the directions of these directions will also change accordingly.
[0030] In addition, in the description of this application, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0031] In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the specific embodiments of the present invention will be described below with reference to the drawings. Obviously, the drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, without creative work, other drawings can be obtained based on these drawings and obtained Other embodiments.
[0032] In the first embodiment, such as figure 1 As shown, this embodiment provides a drainage asphalt pavement with a replaceable horizontal drainage hose, which includes from top to bottom: a large void permeable asphalt concrete surface layer 1, a modified emulsified asphalt bleeding seal layer 3, and an asphalt mixture The middle and lower layer 5, the graded crushed stone seal layer 6, the bonding layer and the base layer 7. Among them, the middle and lower layer 5 of the asphalt mixture is provided with a horizontal drainage cutting groove 4, and the horizontal drainage cutting groove 4 is provided with multi-layer water permeable Drain pipe group 2. The drainage pipe group 2 includes a spiral spring-type metal permeable hose and a porous and permeable PVC drainage pipe group. The metal permeable hose is sleeved outside the PVC drainage pipe group. The PVC drainage pipe group includes multiple PVC drainage pipes of different pipe diameters. Multiple PVC drainage pipes of different pipe diameters are sleeved in sequence according to the pipe diameter. A high-efficiency lubricant is coated between the multiple PVC drainage pipes of different pipe diameters. In this embodiment, by optimizing the drainage pipe set 2 of the drainage asphalt pavement, the replaceable drainage pipe set 2 is adopted. When the drainage pipe set 2 is blocked, the blocked PVC drainage pipe can be replaced with the blockage in a new way. Withdrawing to realize the unobstructed drainage channel in the drainage pipe, the replacement process is convenient and quick, and the design method of multi-layer PVC drainage pipe sleeve realizes the function of multiple extraction, and extends the drainage by extending the unobstructed life of the horizontal drainage pipe group The life of the overall water seepage function of the asphalt pavement.
[0033] Specifically, the large-void permeable asphalt concrete surface layer 1 refers to the artificially selected mineral material (gravel or crushed gravel, stone chips or sand, mineral powder, etc.) with a certain gradation composition and a certain proportion of road asphalt materials , Mixture made under strict control conditions. The thickness of the large void permeable asphalt concrete surface layer 1 is 40-60mm, and the porosity is 18-22%. In order to ensure the compaction effect of the layer mixture in the construction process, diabase or basalt is preferred.
[0034] The width of the transverse drainage slot is 40-50mm, and the depth of the transverse drainage slot is 20-25mm, which is cut by a small cutting machine. The drainage pipe set 2 is composed of two different material permeable pipes. The outer layer is a spiral spring-type metal permeable hose, which has been anti-rust treatment, and the inner hole diameter is 20-30mm. The inner layer is a set of porous and permeable PVC drainage pipes, the inner diameter of which is smaller than the outer spiral spring type metal permeable hose. The PVC drainage pipe set is composed of 2-3 layers of PVC drainage pipe sleeves. In order to ensure that the PVC drainage pipe can be easily drawn out, it is necessary to apply a high-efficiency lubricant between the layers of the PVC drainage pipe.
[0035] The modified emulsified asphalt water-bleeding seal layer 3 is impermeable, the thickness of the modified emulsified bitumen water-bleeding seal layer 3 is 0.3-0.6 mm, and the modified emulsified bitumen water-bleeding seal layer 3 is preferably a slurry seal.
[0036] The lower layer 5 in the asphalt mixture is composed of dense-graded asphalt mixture. The thickness of the lower layer 5 in the asphalt mixture is 50-60 mm, and the porosity is 3-6%. The lower layer 5 of the asphalt mixture is preferably AC-16/AC-20 graded asphalt mixture. The graded gravel seal 6 is a synchronous gravel seal.
[0037] The adhesive layer is adhesive layer oil or permeable layer oil. The adhesive layer needs to be determined according to the type of base layer 7. When the base layer 7 is of asphalt concrete type, the adhesive layer oil is used; when the base layer 7 is a cement concrete panel, the permeable layer oil is used . When the base layer 7 is an elevated cement concrete panel, a bridge surface shot blasting machine needs to be used for roughening treatment to increase the friction of the panel.
[0038] The construction process of the replaceable drainage asphalt pavement with the horizontal drainage hose of the present invention is as follows:
[0039] 1) Preparation for construction: Lay out the line in accordance with the design requirements, clean up the site, and prepare materials and tools;
[0040] 2) Base 7 treatment: When it is an elevated cement concrete panel, use a bridge deck shot blasting machine for roughening treatment. When it is an asphalt concrete type, it is necessary to ensure water bleeding and flatness during the construction of the base layer;
[0041] 3) Sprinkle sticky layer oil/permeable layer oil: when the base layer is asphalt concrete type, spread the sticky layer oil, when the base layer is a cement concrete panel, spread the permeable layer oil;
[0042] 4) Construction of graded gravel seal layer 6: When the sticky layer oil/permeable layer oil is spread, use professional vehicles to carry out the graded gravel seal layer construction to improve the pavement's anti-seepage ability and improve the road surface smoothness and other properties;
[0043] 5) Pavement of the lower layer 5 in the asphalt mixture: After the construction of the graded gravel seal layer is completed, the lower layer AC-16/AC-20 asphalt mixture can be pavement. The construction process strictly controls the gap of the asphalt mixture Rate indicators to ensure the anti-seepage ability of the road surface, while strictly controlling the flatness indicators;
[0044] 6) Treatment of transverse drainage slot 4: Use a small on-site cutting machine for cutting, 40-50mm wide and 20-25mm deep. After cutting, clean the debris in the slot with a vacuum cleaner;
[0045] 7) Construction of modified emulsified asphalt water-bleeding seal layer 3: use professional sealing construction vehicles to implement the construction of modified emulsified bitumen water-bleeding seal layer 3. The construction process strictly controls the amount of spreading to ensure water bleeding and thickness;
[0046] 8) Laying of drainage pipe group 2: Before laying the drainage hose, confirm that the entire pipe body is not damaged. The drainage hose should be laid flat in the middle of the horizontal drainage groove, and the two ends should be fixed at the side ditch of the road. A section outside the road surface, do not cause the drainage hose to run off during the construction process;
[0047] 9) Construction of large-void permeable asphalt concrete surface layer 1: After the drainage hose is laid, the surface layer asphalt mixture is constructed. During the construction process, be careful not to cold joints, and ensure the construction compactness and flatness, to ensure the edge Drain smoothly, do not cut the edges.
[0048] The replacement process of the drainage hose 2 of the drainage asphalt pavement which can be replaced by the horizontal drainage hose of the present invention is as follows:
[0049] 1) Construction preparation: prepare materials and tools;
[0050] 2) Replacement of drainage hose 2: Before replacement, plug the PVC pipe in the innermost layer of drainage hose 2 at both ends, and use special tools to connect one end of the innermost PVC pipe to the traction machine, and use the traction machine to The inner PVC pipe is pulled out and the replacement process is completed.
[0051] In the above-mentioned embodiments, the description of each embodiment has its own focus. For parts that are not described or recorded in detail in an embodiment, reference may be made to related descriptions of other embodiments.
[0052] It should be noted that the above embodiments can be freely combined as required. The above are only the preferred embodiments of the present invention. It should be pointed out that for those of ordinary skill in the art, without departing from the principle of the present invention, several improvements and modifications can be made, and these improvements and modifications are also It should be regarded as the protection scope of the present invention.

PUM

PropertyMeasurementUnit
Bore diameter20.0 ~ 30.0mm
Thickness40.0 ~ 60.0mm
Thickness0.3 ~ 0.6mm

Description & Claims & Application Information

We can also present the details of the Description, Claims and Application information to help users get a comprehensive understanding of the technical details of the patent, such as background art, summary of invention, brief description of drawings, description of embodiments, and other original content. On the other hand, users can also determine the specific scope of protection of the technology through the list of claims; as well as understand the changes in the life cycle of the technology with the presentation of the patent timeline. Login to view more.

Similar technology patents

Vertical face sealing strips for guide vanes of water turbine

InactiveCN101793220Aeasy to replaceEasy to install
Owner:天津市发电技术设备有限公司

Urban roadway curbstone drainage ditch structure

PendingCN111270581Aeasy to cleanUnblocked drainage channels
Owner:SUZHOU GOLD MANTIS GREEN LANDSCAPE LIMITED

Extrusion type rubber bushing structure

Owner:CHERY AUTOMOBILE CO LTD

Air purifier with smooth ventilation function and automatic replacement prompt function

InactiveCN109838837Aeasy to replaceEnsure smooth ventilation
Owner:JIANGSU HUAXIA INTPROP SERVICE CO LTD

Classification and recommendation of technical efficacy words

  • Easy to replace
  • Unblocked drainage channels

Motion capture glove for gesture recognition and calibration method thereof

ActiveCN106445130Aeasy to replaceReduce maintenance difficulty and repair costs
Owner:武汉元生创新科技有限公司

Quick Repair Method of Existing Expansion Joints in Railway Concrete Bridges

InactiveCN102296545Aeasy to replaceConducive to maintenance and repair
Owner:RAILWAY ENG RES INST CHINA ACADEMY OF RAILWAY SCI

Powder metallurgy brake lining for CRH5 (China railway high-speed) motor train unit

ActiveCN103470665ATotally reliable brakingeasy to replace
Owner:北京浦然轨道交通科技股份有限公司 +1

Assembling machine for medium dense battery

ActiveCN103400944ASave butt welding processeasy to replace
Owner:MCA BATTERY MFG

Urban roadway curbstone drainage ditch structure

PendingCN111270581Aeasy to cleanUnblocked drainage channels
Owner:SUZHOU GOLD MANTIS GREEN LANDSCAPE LIMITED
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products