A bridge engineering and construction method technology, applied in bridges, bridge maintenance, bridge reinforcement, etc., can solve the problems of long demolition operation time, affecting the construction period, and high safety hazard factors, so as to achieve safe and reliable project quality, reduce high-altitude workers, The effect of saving construction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Bailey beam removal construction method in the bridge engineering of the present invention comprises the following steps:
[0032] a. In the bridge project, the pouring of the bridge slab structure is completed, and the demolition of the Bailey beam begins after the supporting scaffolding dismantling permit is met.
[0033] b. Start the support lowering device at both ends of Bailey beam 1, so that the Bailey beam as a whole is lowered to a distance of about 200mm from the bottom surface of the bridge.
[0034] c. Two Bailey beam ends form a group and penetrate 15# channel steel 3 in series, and use hydraulic jack 6 in the middle of the two beams to make the Bailey beam end top up to about 50mm from the supporting surface of I-beam 4 below , the I-beam is supported by the lower column 5, and then the ends of the remaining Bailey beams are lifted up in turn by the same method; please refer to figure 1 , figure 1 It is a schematic diagram of grouping of Bailey beams and...