Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Building recycled material preparation system and preparation method

A preparation system and construction technology, applied in the direction of climate sustainability, sustainable waste treatment, solid waste management, etc., can solve the problems of fine grinding of buildings that cannot be abandoned

Active Publication Date: 2020-06-09
深圳市鹏锦生混凝土有限公司
View PDF7 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the patent cannot finely grind abandoned buildings into recycled building materials

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building recycled material preparation system and preparation method
  • Building recycled material preparation system and preparation method
  • Building recycled material preparation system and preparation method

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach 1

[0035] Combine below Figure 1-9To illustrate this embodiment, the present invention relates to the field of building recycled materials, more specifically a system and method for preparing building recycled materials, including a flat plate 1, a pressure plate 4, an annular groove 401, a front and rear moving column 402, a stopper 403, Cross column 404, portal frame 405, upright column 406, strip seat 5, lower convex plate 501, fixed shaft 502, flat turning bar 6, vertical connecting bar 601, push-pull column 603 and inserting column 604, the present invention can make abandoned building Finely ground to form a building recycled material.

[0036] The pressure plate 4 is attached to the upper side of the flat plate 1, and the center of the upper side of the pressure plate 4 is fixedly connected with a column 406, and the column 406 is slidably connected with a front and rear moving column 402 in the front and rear direction. A compression spring 1 is socketed, and the two co...

specific Embodiment approach 2

[0038] Combine below Figure 1-9 To illustrate this embodiment, the building regeneration material preparation system also includes a fastening screw II605, the push-pull column 603 is slidably connected to the vertical connecting bar 601, the lower part of the vertical connecting bar 601 is threadedly connected with a fastening screw II605, and the fastening screw II605 The push-pull column 603 is fixed on the push-pull column 603 . The push-pull column 603 can slide on the vertical connecting bar 601, and then drive the insertion cylinder 604 to move, and then adjust the distance between the axis of the insertion cylinder 604 and the axis of the fixed shaft 502, the greater the distance between the axis of the insertion cylinder 604 and the axis of the fixed shaft 502 , the larger the coverage area of ​​the platen 4 moving along a circular trajectory, the larger the abandoned buildings on the plate 1 can be ground.

specific Embodiment approach 3

[0040] Combine below Figure 1-9 To illustrate this embodiment, the building regeneration material preparation system also includes a flat seat 506, a motor 507, a gear 508, a stop pin 509 and a gear ring 602. 502 is set coaxially, the fixed shaft 502 is fixedly connected with a stop pin 509, the stop pin 509 is located on the upper side of the pan bar 6, the upper part of the fixed shaft 502 is fixedly connected with a flat seat 506, and the lower side of the flat seat 506 is fixedly connected with a motor 507 , a gear 508 is fixedly connected to the output shaft at the lower end of the motor 507 , and the gear 508 is meshed with the inner ring of the gear ring 602 for transmission. When the motor 507 rotates, it can drive the gear 508 to rotate. When the gear 508 rotates, it drives the gear ring 602 to rotate. Rotate, and then drive the platen 4 to translate along a circular track, and finely grind the construction waste on the plate 1.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the field of building recycled materials, and in particular, relates to a building recycled material preparation system and preparation method. The method comprises the steps:1, building waste is placed on the upper side of a flat plate; 2, when a motor rotates, a gear is driven to rotate, and then a pressure disk is driven to translate along a circular track to finely grind the building waste on the flat plate; 3, the ground building waste can fall off from a rectangular hole, an inclined sliding plate is in an inclined state when being opened, and at the moment, theconstruction waste falling off from the rectangular hole falls on the inclined sliding plate and slides off from the inclined sliding plate; and 4, a glue substance is introduced into a hollow pipe from a liquid inlet pipe, so that the glue substance is sprayed out from two nozzles and is sprayed on the crushed construction waste powder sliding down from the inclined sliding plate. The preparation system comprises a flat plate, a pressing disc, an annular groove, a front-back moving column, a blocking head, a transverse column, a door-shaped frame, a stand column, a strip-shaped base, a lowerprotruding plate, a fixing shaft, a horizontal rotating strip, a vertical connecting strip, a push-pull column and an inserting cylinder.

Description

technical field [0001] The invention relates to the field of building recycled materials, more specifically to a preparation system and method for building recycled materials. Background technique [0002] The patent number is CN201910348845.2, which discloses a method of using waste concrete to make recycled building aggregates. The invention belongs to the technical field of recycled building materials processing, and specifically relates to a method of using waste concrete to make recycled building aggregates. The invention includes the steps of material sorting, primary crushing, magnetic separation, secondary crushing, screening, surface treatment, soaking treatment, surface strengthening treatment, carbon dioxide treatment, diatomite addition and the like. In this invention, the prepared coarse aggregate is stirred in a mixer to remove part of the cement stone attached to the surface of the coarse aggregate; then soaked in HCl solution to soften and dissolve part of th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): C04B20/02C04B18/16C04B20/10
CPCC04B18/16C04B20/026C04B20/10Y02W30/91
Inventor 王凯
Owner 深圳市鹏锦生混凝土有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products