Wall cast-in-place area formwork reinforcing structure and construction method
A wall structure and template reinforcement technology, which is applied in the direction of formwork/formwork/work frame, connectors of formwork/formwork/work frame, building construction, etc., can solve the problem of screwing in screw rods and adding decorative surfaces , Reinforcement is not tight, damaged mold expansion and other problems, to achieve the effect of high fault tolerance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0063] Such as Figure 1-4 As shown, in this embodiment, the side with the inner leaf wall 102a is the shear wall 102, that is, it completely includes the inner leaf wall 102a, the outer leaf wall 102c and the insulation board 102b. The wall connected to the shear wall 102 is a pcf board 103, which only includes the outer leaf wall 103c and the insulation layer 103b, and the inner leaf wall 103a is obtained by cast-in-place. An L-shaped corner cast-in-place area is formed between the walls.
[0064] The raised formwork 2 closes the cast-in-place area 101 . The template 2 is made of metal, and the inner wire mother 301 is located in the inner leaf wall 103a. Since it is an L angle, the template is also L-shaped. There is a rib structure on the outer side of the formwork 2, and the rib structure includes a plurality of parallel and horizontally arranged transverse ribs 51, and longitudinally arranged longitudinal ribs 52 located on the transverse ribs. In this embodiment, th...
Embodiment 2
[0071] Such as Figure 6-11 As shown, in this embodiment, the side with the inner leaf wall 102a is a shear wall, that is, it completely includes the inner leaf wall 102a, the outer leaf wall 102c and the insulation board 102b. The wall connected to the shear wall is a pcf board, which only includes the outer leaf wall 103c and the insulation layer 103b, and the inner leaf wall has not yet been cast-in-situ. An L-shaped corner cast-in-place area is formed between the walls.
[0072] Template 2 can be made of wood or other materials. On the back of the formwork 2 there are cylindrical or other similarly shaped transverse ribs 51 arranged in multiple groups in parallel, and the inner side of the transverse ribs 51 is a longitudinal rib 52, and in this embodiment the longitudinal ribs 52 are multiple wooden squares arranged vertically.
[0073] The first reinforcement tool includes two types in this embodiment. The first type is used to reinforce the formwork, insulation layer,...
Embodiment 3
[0080] Such as Figure 12-13 As shown, this embodiment is basically the same as Embodiment 2, the difference is that the inner leaf wall 103a inside the pcf board has been formed, and the first reinforcement tool 3 used in the inner leaf wall is the first reinforcement tool of the second type in Embodiment 2 , the second reinforcing tool 4 is also arranged in a cross shape like the first embodiment.
[0081] A construction method for formwork reinforcement in a wall cast-in-place area, comprising:
[0082] Step 1: Butt two adjacent walls, support the formwork, and form the cast-in-place area of the wall structure;
[0083] Step 2: Connect the formwork and the wall structure through the first reinforcement tooling; the first reinforcement tooling includes an inner wire nut and a fast wire assembly, the inner wire nut is located in the wall structure, and the fast wire assembly Connect with one end of the inner wire nut close to the formwork, so as to realize the fixing of t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


