Unlock instant, AI-driven research and patent intelligence for your innovation.

Shield tunneling machine with function of quickly freezing tunnel face and construction method

A technology of face and shield machine, which is applied in earth-moving drilling, mining equipment, tunnels, etc., can solve the problems of long freezing period, low efficiency and long period, and achieve the effect of short freezing period

Active Publication Date: 2020-07-03
CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
View PDF7 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the prior art, although there is a construction process of using liquid nitrogen freezing method to reinforce the tunnel when the shield enters and exits the tunnel, the layout of the frozen pipelines is always on the ground or on the ground surface, and it takes a long time to occupy the ground space; Due to traffic flow restrictions, the ground is not ready for freezing construction
[0004] In existing patents such as "Frozen Cutter Arrangement Structure CN201821967228", it is proposed to use a shield cutter with a freezing function to freeze the tunnel face, so as to realize the purpose of replacing the cutter and overhauling the cutter in the shield machine, but this technology needs to be designed and manufactured in advance Frozen cutter head, and the design of the cutter head with freezing function, high manufacturing cost and long cycle; at the same time, the brine freezing technology is used, the freezing cycle is long and the efficiency is low

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Shield tunneling machine with function of quickly freezing tunnel face and construction method
  • Shield tunneling machine with function of quickly freezing tunnel face and construction method
  • Shield tunneling machine with function of quickly freezing tunnel face and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The technical solutions of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0035] Such as figure 1 As shown, a shield machine with the function of quickly freezing the tunnel face includes a shield machine cutterhead cutter 110, a main drive device, a screw conveyor 113, a front shield 111, a middle shield 112, a tail shield 114 and segment assembly The machine 104 also includes a liquid nitrogen tank and a portable propulsion device 103. The liquid nitrogen tank is connected to the liquid supply pipe of the freezer 102 provided at the front of the shield machine thro...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a shield tunneling machine with a function of quickly freezing a tunnel face and a construction method. The shield tunneling machine comprises a shield tunneling machine cutterhead cutter, a main driving device, a spiral conveyor, a front shield, a middle shield, a tail shield and a segment erector, and further comprises a liquid nitrogen tank and a portable propelling device, wherein the liquid nitrogen tank is connected with a freezer arranged at the front part of the shield tunneling machine through a diverter valve and a liquid supply hose. By means of the method, quick pre-drilling of freezing holes in the shield tunneling machine is achieved for positioning, freezing pipelines are arranged, the tunnel face in front of the shield tunneling machine is reinforced,and maintenance in the shield tunneling machine, safe bin opening for cutter replacement and reinforcement during tunnel portal entering and exiting are achieved.

Description

technical field [0001] The invention relates to the technical field of tunnel boring machines, in particular to a shield machine with the function of rapidly freezing the tunnel face and a construction method. Background technique [0002] The artificial ground freezing method is a special construction technology that uses artificial refrigeration technology to freeze the water in the ground to increase its strength and stability, so that underground engineering excavation and masonry construction can be carried out under the protection of the frozen wall. It is a temporary reinforcement technology. When the reinforcement strength is not needed, it can be melted by forced thawing technology. The freezing method construction has a history of more than 100 years, and it has been widely used in my country for more than 40 years. Since 1992, the freezing method technology has been used in subway construction in Shanghai, Beijing and other places. [0003] In the prior art, alth...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/08E21D9/00
CPCE21D9/08E21D9/0671E21D9/001E21D9/002
Inventor 卓普周叶蕾于庆增闫阳
Owner CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD