A construction method and technology of hybrid piles, which are applied in foundation structure engineering, sheet pile walls, earthwork drilling and mining, etc., can solve the problems of pile body strength influence, large effort, unfavorable construction, etc., so as to prolong the service life and avoid the later stage Operational disease problems, the effect of increasing injectability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] The invention will be further described below in conjunction with the accompanying drawings.
[0034] see figure 1 , a shield construction method, comprising the following steps:
[0035] Step 1. According to the survey and design data, determine the area that the tunnel plans to pass through; design the mixed pile body 7 and the full cement mixing pile 4 according to the area planned to pass through the tunnel, the thickness of the loess strata that is planned to pass through, and relevant construction regulations. Pile length, pile diameter, pile position and pile spacing, formulate a pile layout plan; design the length of the tunnel lining segment 5 and the position of the grouting hole 6 on the tunnel lining segment 5;
[0036] Step 2. According to the pile position of the mixed pile body 7 in the pile layout plan, set the mixed pile body 7 in the current construction area, specifically including the following contents: