Pile block structure of steel trestle and steel trestle reinforcing method
A technology of steel trestle and pile top is applied in the field of steel trestle pile top structure and steel trestle reinforcement to achieve the effect of improving connection strength and improving work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] This embodiment provides a steel trestle pile top structure, please refer to Figure 4 , Figure 5 with Figure 6 , the steel trestle pile top structure includes foundation pile group 100, cap 200, installation platform, Bailey frame 400, roof 500 and drilling rig 600;
[0050] The foundation pile group 100 includes steel pipe piles 110 distributed at least at intervals, one end of the steel pipe pile 110 is inserted into the ground, and the other end forms a supporting end for installing the cap 200;
[0051] The installation platform is fixedly arranged on the side of the bearing platform 200 away from the ground;
[0052] The cap 200 includes a first side beam 210 and a second side beam 230 arranged in parallel; the first side beam 210 is fixedly connected to one side of all steel pipe piles 110, and the second side beam 230 is connected to the other side of all steel pipe piles 110. Side fixed connection; the Bailey frame 400 is erected on the installation platfo...
Embodiment 2
[0061] This embodiment provides a steel trestle reinforcement method, which uses the steel trestle pile top structure provided in Embodiment 1, including steps:
[0062] A reinforcing pipe 130 is arranged in the steel pipe pile 110, and the reinforcing pipe 130 is coaxially slidably connected with the steel pipe pile 110, and the steel pipe pile 110 is sequentially driven into the underground gravel layer to form a foundation pile group 100; on the foundation pile group 100 Set the cap 200; set the mounting platform on the cap 200, fix the Bailey frame 400 on the mounting platform; fix the top plate 500 on the Bailey frame 400, and align the working holes of the top plate 500 with the corresponding steel pipe piles 110.
[0063] The drill rod 610 installed on the drill rig 600 ; the drill bit 630 is installed at the end of the drill rod 610 ; the body of the drill rig 600 is fixed on the top plate 500 .
[0064] The drill pipe 610 drives the drill bit 630 through the working h...