Construction method of deep foundation pit dewatering wells
A construction method and technology for dewatering wells, which are applied in infrastructure engineering, construction, etc., can solve the problems of high production cost, slow water filtration of precast concrete pipes, and poor filtration effect.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0022] The deep foundation pit dewatering well construction method provided by the present embodiment comprises the following steps: S1, according to the soil quality of the construction site and the site area, determine the depth, position, and quantity of each dewatering well in the deep foundation pit to obtain the deep foundation pit The construction plan of the dewatering well; S2, according to the construction method of the dewatering well, measure and set out to mark the specific location of each dewatering well; S3, according to the requirements of the construction plan of the dewatering well of the deep foundation pit, make the water filter pipe 1 to be hoisted at the construction site (such as figure 1 , figure 2 As shown), the water filter pipe 1 includes a reinforcement cage 11 whose diameter is smaller than the aperture of the rotary-dug well, and a horizontally arranged reinforcement mesh 12 is fixed at the lower end of the reinforcement cage 11, and a first filt...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 