Scheduling method for automatic loading equipment for goods
A scheduling method and cargo technology, applied in the automatic loading of packaged cargo, scheduling of automatic cargo loading equipment, and bagging, can solve the problems of high manufacturing and maintenance costs, different sizes of carriages, and large changes, so as to ensure loading Efficiency, good loading efficiency, and flexible docking effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0066] In order to make the object, technical solution and advantages of the present invention clearer, the implementation manner of the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0067] see Figure 26 , shows a schematic flowchart of the scheduling method in the embodiment of the present invention. It specifically discloses a scheduling method for automatic cargo loading equipment, in which the cargo includes cement, flour and other packages and is not limited to cement packages and flour and other goods, the scheduling method referred to in this embodiment is actually a cargo automatic The operation method of the vehicle equipment can be realized through manual or programming settings.
[0068] Specifically, the above-mentioned automatic cargo loading equipment includes a frame 1, at least one first conveyor belt, a second conveyor belt, and a receiving and loading device 8, and the receiving and loading devi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


