Anchor block structure and its construction method
A construction method and anchor block technology, which is applied in construction, bridge construction, bridges, etc., can solve the problem that the anchor block structure cannot be used as the abutment foundation of the approach bridge, and achieve the effect of reducing the amount of concrete and increasing the load-bearing capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] see Figure 1 to Figure 3 As shown, this embodiment provides an anchor block structure, including a left anchor block 101 and a right anchor block 102, and a post-cast section 107 is arranged between the left anchor block 101 and the right anchor block 102; The inside of the block 101 is provided with an empty bin 103, and the top of the empty bin 103 is provided with a counterweight top plate 104; the right anchor block 102 is a solid structure, and the upper surface of the counterweight top plate 104 and the upper surface of the right anchor block 102 are used to form an approach bridge abutment foundation.
[0033] The anchor block structure provided by this embodiment is provided with the left anchor block 101 and the right anchor block 102, and the empty compartment 103 is set inside the left anchor block 101, while the right anchor block 102 is a solid structure. A balance weight top plate 104 is set above 103, which can not only balance the lateral counterweight...
Embodiment 2
[0046]This embodiment provides a construction method for an anchor block structure, which is used to construct the anchor block structure provided in Embodiment 1 of the present invention, which includes the following steps:
[0047] Layered and block-by-block construction of the left anchor block 101 and the right anchor block 102;
[0048] Formwork system construction of the left anchor block 101 and the right anchor block 102;
[0049] Concrete pouring construction of the left anchor block 101 and the right anchor block 102;
[0050] Carry out the construction of balance weight top plate 104 above empty warehouse 103;
[0051] Post-cast section 107 construction.
[0052] Optionally, in some embodiments, before the layering and block construction of the left anchor block 101 and the right anchor block 102, the foundation pit excavation and cushion construction steps are also included, and the foundation pit excavation is completed. Immediately after that, pour a concrete ...