Waste mercury reagent recovery method
A recovery method and reagent technology, applied in the field of physical recovery and regeneration of mercury, can solve the problems of high cost and difficult disposal of waste mercury-containing reagents, and achieve the effects of low cost, low treatment cost and good economy.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0016] Take 500 mL of waste mercury reagent, filter it through woolen cloth to remove the residue, and then filter it through suede to remove impurities. Add the waste mercury reagent obtained after filtration into the cyclone pickling tank, adjust the pH of the liquid to 3.5, control the washing time for 1 hour, let stand for 1 hour after washing, and release the mercury-containing reagent in the lower layer.
[0017] Add the waste mercury reagent obtained after pickling into the cyclone alkali washing tank, adjust the pH of the liquid to 8.5, control the washing time for 1 hour, and let it stand for 1 hour after washing to form stratification, and release the mercury-containing reagent in the lower layer.
[0018] Add the waste mercury reagent obtained after alkali washing into the swirling water washing tank, control the washing time for 1 hour, and let it stand for 1.5 hours after washing to form stratification, release the mercury-containing reagent in the lower layer, and...
Embodiment 2
[0021] Take 500 mL of waste mercury reagent and filter it through wool to remove the residue, then filter it with suede to remove impurities. Add the waste mercury reagent obtained after filtration into the cyclone pickling tank, adjust the pH of the liquid to 4.5, control the washing time for 2 hours, let stand for 1 hour after washing, and release the mercury-containing reagent in the lower layer.
[0022] Add the waste mercury reagent obtained after pickling into the cyclone alkali washing tank, adjust the pH of the liquid to 8.0, control the washing time for 1.5 hours, and let it stand for 1 hour after washing to form stratification, and release the mercury-containing reagent in the lower layer.
[0023] Add the waste mercury reagent obtained after alkali washing into the swirling water washing tank, control the washing time for 1.5 hours, and let it stand for 1.5 hours after washing to form stratification, release the mercury-containing reagent in the lower layer, and obta...
Embodiment 3
[0026] Take 500 mL of waste mercury reagent and filter it through wool to remove the residue, then filter it with suede to remove impurities. Add the waste mercury reagent obtained after filtration into the cyclone pickling tank, adjust the pH of the liquid to 5.5, control the washing time for 3 hours, let stand for 1 hour after washing, and release the mercury-containing reagent in the lower layer.
[0027] Add the waste mercury reagent obtained after pickling into the cyclone alkali washing tank, adjust the pH of the liquid to 7.5, control the washing time for 2 hours, and let it stand for 1 hour after washing to form stratification, and release the mercury-containing reagent in the lower layer.
[0028] Add the waste mercury reagent obtained after alkali washing into the swirling water washing tank, control the washing time for 2 hours, and let it stand for 1.5 hours after washing to form stratification, release the mercury-containing reagent in the lower layer, and obtain a...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
