Composite retaining structure suitable for deep tunnel of clastic schist layer and construction method thereof
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CHINA TIESIJU CIVIL ENG GRP CO LTD
- Publication Date
- 2020-08-25
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the field of tunnel support structures, in particular to a combined support structure suitable for deep-buried tunnels in clastic schist formations and a construction method thereof. Background technique
[0002] The surrounding rock of the clastic schist formation is broken, with low cohesion and poor self-stabilization ability. If the support is improper after excavation, it is easy to cause collapse and slide of the excavation face and face, excessive support deformation and support failure. The structural instability seriously affects the construction quality and operation safety of the tunnel.
[0003] At present, deep-buried tunnels in clastic schist still adopt the traditional "advance support + steel arch frame + shotcrete + bolt" primary support form, and there is no specific calculation method for determining support parameters. It is often impossible to guarantee the stability of the excavation face and the tunnel f...